INSP - Final | 6/9/1999 | 6/9/1999 | 6/9/1999 | P | PASS |
Wes Worcester
|
|
|
06/09/99 342 - John ###-#### c/c issued
|
INSP - Grading Inspection | 6/9/1999 | | 6/9/1999 | | BOND |
Rita DeYoung
|
|
|
Grading is approved pending receipt of $500.00 surety for incomplete work. The following must be complete before surety is released. Provide as built grading plan with design of retaining wall and engineer's approval of construction. Complete revegetation. remove topsoil around house so that it is no closer than 6 inches from the top of the foundation.
|
INSP - Energy code compliance | 2/16/1999 | 2/16/1999 | 2/17/1999 | P | PASS |
|
|
|
02/16/99 338 - made ok to cover
|
INSP - Framing/Rough-in | 2/16/1999 | 2/16/1999 | 2/16/1999 | A | PASS |
|
|
|
02/16/99 338 - 340 said all paperwork is in order made ok
|
INSP - Framing/Rough-in | 2/12/1999 | 2/12/1999 | 2/12/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - c/n, fireblocks, stairs, nail hangers ,ok to ins.
|
INSP - Framing/Rough-in | 2/10/1999 | 2/11/1999 | 2/11/1999 | P | FAIL |
Jim Storey
|
|
|
02/11/99 301 - carl trans insp and is edoing it.
|
INSP - Foundation | 11/18/1998 | 11/18/1998 | 11/18/1998 | | PASS |
Wes Worcester
|
|
|
11/18/98 342 - JOHN ###-#### FT INSP
|
INSP - Foundation | 10/15/1998 | 10/16/1998 | 10/16/1998 | A | PASS |
Wes Worcester
|
|
|
10/16/98 342 - BRIAN-###-#### FOR FT INSP-9:00?
|