INSP - Letter of compliance | 1/20/1999 | 1/20/1999 | 1/20/1999 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - lc 015751
|
INSP - Letter of compliance | 1/20/1999 | 1/20/1999 | 1/20/1999 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - lc 015751
|
INSP - Final | 1/15/1999 | 1/19/1999 | 1/19/1999 | A | FAIL |
Jim Sly
|
|
|
01/19/99 316 - Done by Carl D.
|
INSP - Final | 1/19/1999 | 1/19/1999 | 1/19/1999 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - final ok, 316 area
|
INSP - Energy code compliance | 12/2/1998 | 12/2/1998 | 12/2/1998 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Framing/Rough-in | 12/2/1998 | 12/2/1998 | 12/2/1998 | P | PASS |
Tom Arcoraci
|
|
|
12/02/98 408 - CHAD ###-#### REINSPECTION FEE PAID/
|
INSP - Framing/Rough-in | 11/23/1998 | 11/24/1998 | 11/24/1998 | A | FAIL |
Tom Arcoraci
|
|
|
11/24/98 408 - DAN- ###-#### FR INSP did not comply with past correction notice
|
INSP - Framing/Rough-in | 11/13/1998 | 11/13/1998 | 11/16/1998 | P | FAIL |
Jim Sly
|
|
|
11/13/98 316 - C/N...Need Engineering for missed HD's per prev corr noti
|
INSP - Framing/Rough-in | 10/27/1998 | 10/27/1998 | 10/27/1998 | P | PART |
Jim Sly
|
|
|
10/27/98 316 - reinspect shear panel ..C/N..Check listed items at frame.
|
INSP - Framing/Rough-in | 10/26/1998 | 10/26/1998 | 10/27/1998 | P | FAIL |
Jim Sly
|
|
|
10/26/98 316 - C/N....shear panel insp Complete per Engineering.....
|
INSP - Foundation | 9/11/1998 | 9/14/1998 | 9/14/1998 | A | FAIL |
Jim Sly
|
|
|
09/14/98 316 - No appr plans....
|