Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-02505
StatusFinaled
Name SCOTT EDENS
Site Address 3614 W STATE ST
Project NameALBERTSON'S #189
Customer Number 
ePlanReviewNo
Description
ALBERTSON'S, STORE #189 * TO CONSTRUCT A NEW 57,015 S.F. TYPE 111-N, FULLY FIRE SPRRINKLERED SUPERRMARRKET PER APPROVED PLANS, ATTACHED REQUIREMENTS,DRH98-0102 PC#593-98. FIRE SPRINKLERS USED FOR AREA.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 11/16/199911/16/1999 DONE
Details
BLD-Final11/12/199911/15/199911/15/1999APASS
DetailsCarl Dependahl
Final reinspect - Mark, ###-#### Final ok- called 310 for C/O.
BLD-Final11/15/199911/15/199911/15/1999ACANC
DetailsCarl Dependahl
Sent to Wes.
BLD-Final10/28/199910/29/199910/29/1999PFAIL
DetailsWes Worcester
Mark, ###-#### - Wes, I have the card - Cathy No one on site, Mark not in, left message to reschedule and what if any, finals are left.
FIRE-Final Inspection10/28/199910/29/199910/29/1999APASS
DetailsJoe Tawney
Joe, I have the card at my desk. Cathy Reinsp. Ok for pem. Occ.
INSP-Final Inspection8/27/19999/1/19999/1/1999AFAIL
DetailsJoe Tawney
09/01/99 406 - REINSP FAIL FIRE HYD, REFR PIPE LABELING, PAPER WORK
INSP - Final7/16/19997/16/19997/16/1999 FAIL
DetailsJoe Tawney
/ / 406 - REINSP FAIL ALL ITEMS ON C/N NOT COMPLETE
INSP - Final7/13/19997/13/19997/13/1999PPART
DetailsWes Worcester
MARK ###-####, temp ok
INSP - Framing/Rough-in7/8/19997/9/19997/9/1999PPASS
DetailsWes Worcester
07/09/99 342 - ###-####
INSP-Final Inspection7/8/19997/9/19997/9/1999PPART
DetailsJoe Tawney
07/09/99 406 - FINAL OK FOR TEMP OCC CORR NOTICE ISSUED
INSP-Sprinkler Rough-in/Hydro6/15/19996/15/19996/15/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON ABOVE GROUND HYDRO TEST
INSP-Sprinkler Rough-in/Hydro6/15/19996/15/19996/15/1999 PART
DetailsJoe Tawney
/ / 406 - ROUGH IN SEVERAL CORRECTIONS NOTED
INSP-Conference6/14/19996/14/19996/14/1999 PART
DetailsJoe Tawney
/ / 406 - CONF WITH RON ON LOCATION OF KNOX BOX
INSP-Sprinkler Rough-in/Hydro6/14/19996/14/19996/14/1999 FAIL
DetailsJoe Tawney
/ / 406 - AB GRND HYDRO TEST FAIL
INSP-Final Inspection6/10/19996/11/19996/11/1999PNR
DetailsJoe Tawney
06/11/99 406 - HYDRO TEST NOT READY RESCHEDULE
INSP - Framing/Rough-in5/10/19995/11/19995/11/1999APART
DetailsWes Worcester
05/11/99 342 - Scheduled by Hello!. Contact phone is [8952080].
INSP-Supply line flush4/22/19994/22/19994/22/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON SUPPLY LINE FLUSH
INSP - Framing/Rough-in4/16/19994/16/19994/16/1999PPASS
DetailsWes Worcester
04/16/99 342 - Scheduled by Hello!. Contact phone is [8592080].
INSP-Conference4/15/19994/15/19994/15/1999 PART
DetailsJoe Tawney
/ / 406 - CONF ON CONCEALED SPACES
INSP - Framing/Rough-in4/8/19994/8/19994/8/1999 PART
DetailsWes Worcester
04/08/99 342 - Scheduled by Hello!. Contact phone is [8592080]. will
INSP - Framing/Rough-in4/7/19994/8/19994/8/1999APART
DetailsWes Worcester
04/08/99 342 - Scheduled by Hello!. Contact phone is [8592080]. Ron ha
INSP - Concrete1/28/19991/28/19991/28/1999PPART
DetailsWes Worcester
noted that MTI requested masons to use hot water per cold weather criteria
INSP - Wall cover1/27/19991/27/19991/27/1999PPART
DetailsWes Worcester
reviewed moisture content over 30% on split face and 7-score block
INSP - Foundation1/25/19991/26/19991/26/1999APART
DetailsWes Worcester
01/26/99 342 - Scheduled by Hello!. Contact phone is [3838553]. SPEC I
INSP - Foundation1/20/19991/21/19991/21/1999APART
DetailsWes Worcester
01/21/99 342 - Scheduled by Hello!. Contact phone is [3838553]. addres
INSP - Concrete1/15/19991/20/19991/20/1999PPART
DetailsWes Worcester
01/20/99 342 - Scheduled by Hello!. specinsp on site
INSP - Foundation1/28/19991/29/19991/19/1999APART
DetailsWes Worcester
01/29/99 342 - Scheduled by Hello!. Contact phone is [3838553]. spec i
INSP - Concrete1/14/19991/15/19991/15/1999APART
DetailsWes Worcester
01/15/99 342 - Scheduled by Hello!. Contact phone is [3838553]. still
INSP - Foundation1/12/19991/13/19991/13/1999AFAIL
DetailsCarl Dependahl
01/13/99 340 - Scheduled by Hello!. Contact phone is [3838553]. part, forms only west side, bar not tied, pending spec insp report
INSP - Framing/Rough-in1/11/19991/12/19991/12/1999APART
DetailsWes Worcester
01/12/99 342 - RON PAGER ###-#### CONFERENCE precon ok
INSP - Foundation1/8/19991/11/19991/11/1999AFAIL
DetailsWes Worcester
01/11/99 342 - incorrect rebar lap, insufficient cover in NE column pad,
INSP - Foundation1/6/19991/7/19991/7/1999APART
DetailsWes Worcester
01/07/99 342 - phone is [3838553]. rebar still being tied, need 3" clea
INSP - Foundation1/6/19991/6/19991/6/1999PPART
DetailsCarl Dependahl
Albertsons at 36th & State...conf w/ supt...they have begun special insp log. All soils compaction, concrete, and masonry req spec. insp. WIP for excavation.