Permanent Occupancy | | 11/16/1999 | 11/16/1999 | | DONE |
|
|
|
|
BLD-Final | 11/12/1999 | 11/15/1999 | 11/15/1999 | A | PASS |
Carl Dependahl
|
|
|
Final reinspect - Mark, ###-#### Final ok- called 310 for C/O.
|
BLD-Final | 11/15/1999 | 11/15/1999 | 11/15/1999 | A | CANC |
Carl Dependahl
|
|
|
Sent to Wes.
|
BLD-Final | 10/28/1999 | 10/29/1999 | 10/29/1999 | P | FAIL |
Wes Worcester
|
|
|
Mark, ###-#### - Wes, I have the card - Cathy No one on site, Mark not in, left message to reschedule and what if any, finals are left.
|
FIRE-Final Inspection | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | PASS |
Joe Tawney
|
|
|
Joe, I have the card at my desk. Cathy Reinsp. Ok for pem. Occ.
|
INSP-Final Inspection | 8/27/1999 | 9/1/1999 | 9/1/1999 | A | FAIL |
Joe Tawney
|
|
|
09/01/99 406 - REINSP FAIL FIRE HYD, REFR PIPE LABELING, PAPER WORK
|
INSP - Final | 7/16/1999 | 7/16/1999 | 7/16/1999 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL ALL ITEMS ON C/N NOT COMPLETE
|
INSP - Final | 7/13/1999 | 7/13/1999 | 7/13/1999 | P | PART |
Wes Worcester
|
|
|
MARK ###-####, temp ok
|
INSP - Framing/Rough-in | 7/8/1999 | 7/9/1999 | 7/9/1999 | P | PASS |
Wes Worcester
|
|
|
07/09/99 342 - ###-####
|
INSP-Final Inspection | 7/8/1999 | 7/9/1999 | 7/9/1999 | P | PART |
Joe Tawney
|
|
|
07/09/99 406 - FINAL OK FOR TEMP OCC CORR NOTICE ISSUED
|
INSP-Sprinkler Rough-in/Hydro | 6/15/1999 | 6/15/1999 | 6/15/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ABOVE GROUND HYDRO TEST
|
INSP-Sprinkler Rough-in/Hydro | 6/15/1999 | 6/15/1999 | 6/15/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - ROUGH IN SEVERAL CORRECTIONS NOTED
|
INSP-Conference | 6/14/1999 | 6/14/1999 | 6/14/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF WITH RON ON LOCATION OF KNOX BOX
|
INSP-Sprinkler Rough-in/Hydro | 6/14/1999 | 6/14/1999 | 6/14/1999 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - AB GRND HYDRO TEST FAIL
|
INSP-Final Inspection | 6/10/1999 | 6/11/1999 | 6/11/1999 | P | NR |
Joe Tawney
|
|
|
06/11/99 406 - HYDRO TEST NOT READY RESCHEDULE
|
INSP - Framing/Rough-in | 5/10/1999 | 5/11/1999 | 5/11/1999 | A | PART |
Wes Worcester
|
|
|
05/11/99 342 - Scheduled by Hello!. Contact phone is [8952080].
|
INSP-Supply line flush | 4/22/1999 | 4/22/1999 | 4/22/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SUPPLY LINE FLUSH
|
INSP - Framing/Rough-in | 4/16/1999 | 4/16/1999 | 4/16/1999 | P | PASS |
Wes Worcester
|
|
|
04/16/99 342 - Scheduled by Hello!. Contact phone is [8592080].
|
INSP-Conference | 4/15/1999 | 4/15/1999 | 4/15/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF ON CONCEALED SPACES
|
INSP - Framing/Rough-in | 4/8/1999 | 4/8/1999 | 4/8/1999 | | PART |
Wes Worcester
|
|
|
04/08/99 342 - Scheduled by Hello!. Contact phone is [8592080]. will
|
INSP - Framing/Rough-in | 4/7/1999 | 4/8/1999 | 4/8/1999 | A | PART |
Wes Worcester
|
|
|
04/08/99 342 - Scheduled by Hello!. Contact phone is [8592080]. Ron ha
|
INSP - Concrete | 1/28/1999 | 1/28/1999 | 1/28/1999 | P | PART |
Wes Worcester
|
|
|
noted that MTI requested masons to use hot water per cold weather criteria
|
INSP - Wall cover | 1/27/1999 | 1/27/1999 | 1/27/1999 | P | PART |
Wes Worcester
|
|
|
reviewed moisture content over 30% on split face and 7-score block
|
INSP - Foundation | 1/25/1999 | 1/26/1999 | 1/26/1999 | A | PART |
Wes Worcester
|
|
|
01/26/99 342 - Scheduled by Hello!. Contact phone is [3838553]. SPEC I
|
INSP - Foundation | 1/20/1999 | 1/21/1999 | 1/21/1999 | A | PART |
Wes Worcester
|
|
|
01/21/99 342 - Scheduled by Hello!. Contact phone is [3838553]. addres
|
INSP - Concrete | 1/15/1999 | 1/20/1999 | 1/20/1999 | P | PART |
Wes Worcester
|
|
|
01/20/99 342 - Scheduled by Hello!. specinsp on site
|
INSP - Foundation | 1/28/1999 | 1/29/1999 | 1/19/1999 | A | PART |
Wes Worcester
|
|
|
01/29/99 342 - Scheduled by Hello!. Contact phone is [3838553]. spec i
|
INSP - Concrete | 1/14/1999 | 1/15/1999 | 1/15/1999 | A | PART |
Wes Worcester
|
|
|
01/15/99 342 - Scheduled by Hello!. Contact phone is [3838553]. still
|
INSP - Foundation | 1/12/1999 | 1/13/1999 | 1/13/1999 | A | FAIL |
Carl Dependahl
|
|
|
01/13/99 340 - Scheduled by Hello!. Contact phone is [3838553]. part, forms only west side, bar not tied, pending spec insp report
|
INSP - Framing/Rough-in | 1/11/1999 | 1/12/1999 | 1/12/1999 | A | PART |
Wes Worcester
|
|
|
01/12/99 342 - RON PAGER ###-#### CONFERENCE precon ok
|
INSP - Foundation | 1/8/1999 | 1/11/1999 | 1/11/1999 | A | FAIL |
Wes Worcester
|
|
|
01/11/99 342 - incorrect rebar lap, insufficient cover in NE column pad,
|
INSP - Foundation | 1/6/1999 | 1/7/1999 | 1/7/1999 | A | PART |
Wes Worcester
|
|
|
01/07/99 342 - phone is [3838553]. rebar still being tied, need 3" clea
|
INSP - Foundation | 1/6/1999 | 1/6/1999 | 1/6/1999 | P | PART |
Carl Dependahl
|
|
|
Albertsons at 36th & State...conf w/ supt...they have begun special insp log. All soils compaction, concrete, and masonry req spec. insp. WIP for excavation.
|