Permanent Occupancy | | 3/9/1999 | 3/9/1999 | | DONE |
|
|
|
|
INSP - Final | 3/8/1999 | 3/8/1999 | 3/8/1999 | | PASS |
Carl Dependahl
|
|
|
03/08/99 340 - card to cont
|
INSP - Final | 3/5/1999 | 3/8/1999 | 3/8/1999 | P | PASS |
Carl Dependahl
|
|
|
03/08/99 340 - CARD TO CONT
|
INSP-Final Inspection | 3/5/1999 | 3/8/1999 | 3/8/1999 | A | PASS |
Joe Tawney
|
|
|
03/08/99 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 3/4/1999 | 3/5/1999 | 3/5/1999 | A | FAIL |
Carl Dependahl
|
|
|
03/05/99 340 - keep c/n, ok for t/o
|
INSP-Alarm Testing | 3/5/1999 | 3/5/1999 | 3/5/1999 | | PART |
Joe Tawney
|
|
|
03/05/99 406 - FINAL OK FOR TEMP OCC DR HDWRE
|
INSP - Final | 3/3/1999 | 3/4/1999 | 3/4/1999 | P | FAIL |
Carl Dependahl
|
|
|
03/04/99 340 - need fire ok
|
INSP-Final Inspection | 3/4/1999 | 3/4/1999 | 3/4/1999 | | FAIL |
Joe Tawney
|
|
|
03/04/99 406 - FINAL FAIL FIRE EXT, DOOR HDWRE, EXH VENT
|
INSP-Final Inspection | 3/4/1999 | 3/4/1999 | 3/4/1999 | | FAIL |
Joe Tawney
|
|
|
03/04/99 406 - FINAL FAIL FIRE EXT, DOOR HDWRE, EXH VENT
|
INSP-Final Inspection | 3/3/1999 | 3/4/1999 | 3/4/1999 | A | FAIL |
Joe Tawney
|
|
|
03/04/99 406 - FINAL FAIL FIRE EXT, DOOR HDWRE, EXH VENT
|
INSP - Framing/Rough-in | 2/16/1999 | 2/17/1999 | 2/17/1999 | A | PART |
Carl Dependahl
|
|
|
02/17/99 340 - ###-#### reinspection, need verify hvac, ok to cover back
|
INSP - Framing/Rough-in | 2/12/1999 | 2/12/1999 | 2/12/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - 2203; c/n remove osb, patch demising walls, need transfer gr sys.
|
INSP - Framing/Rough-in | 2/11/1999 | 2/11/1999 | 2/11/1999 | P | FAIL |
Carl Dependahl
|
|
|
02/11/99 340 - john ###-#### unit 2033 fail no access
|
INSP - Framing/Rough-in | 2/11/1999 | 2/11/1999 | 2/11/1999 | P | CANC |
Carl Dependahl
|
|
|
02/11/99 340 - ###-####
|
INSP - Framing/Rough-in | 2/10/1999 | 2/10/1999 | 2/10/1999 | P | FAIL |
Carl Dependahl
|
|
|
###-#### John unable to contact, ph# disconnected??
|
INSP-Sprinkler Rough-in/Hydro | 2/8/1999 | 2/8/1999 | 2/8/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - SPKLR ROUGH IN NEED CALCS TO JUSTIFY SPACING ALL ELSE OK
|