INSP - Final | 1/7/1999 | 1/8/1999 | 1/8/1999 | A | PASS |
Russ Owen
|
|
|
01/08/99 407 - Scheduled by Hello!. Contact phone is [2303001].
|
INSP - Letter of compliance | 1/8/1999 | 1/8/1999 | 1/8/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#17394.
|
INSP - Letter of compliance | 1/8/1999 | 1/8/1999 | 1/8/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#17394.
|
INSP - Final | 1/5/1999 | 1/6/1999 | 1/6/1999 | A | FAIL |
Russ Owen
|
|
|
01/06/99 407 - Scheduled by Hello!. Contact phone is [2303001].
|
INSP - Energy code compliance | 11/19/1998 | 11/19/1998 | 11/19/1998 | P | PASS |
Russ Owen
|
|
|
11/19/98 407 - Scheduled by Hello!. Contact phone is [2303001].
|
INSP - Framing/Rough-in | 11/17/1998 | 11/17/1998 | 11/18/1998 | P | PASS |
Russ Owen
|
|
|
11/19/98 407 - Scheduled by Hello!. Contact phone is [2303001].
|
INSP - Framing/Rough-in | 11/12/1998 | 11/12/1998 | 11/12/1998 | P | PASS |
Russ Owen
|
|
|
shear steve ###-#### reinspectiom finally done!
|
INSP - Framing/Rough-in | 11/9/1998 | 11/10/1998 | 11/10/1998 | A | PART |
Russ Owen
|
|
|
need to complete nailing as per engineering.
|
INSP - Wall cover | 11/9/1998 | 11/9/1998 | 11/9/1998 | P | FAIL |
Russ Owen
|
|
|
need to have engineer revise plan at front.
|
INSP-Conference | 11/6/1998 | 11/6/1998 | 11/6/1998 | P | PART |
Russ Owen
|
|
|
Conference with builder about shear nailing inspection.
|
INSP - Framing/Rough-in | 11/4/1998 | 11/5/1998 | 11/5/1998 | P | FAIL |
Russ Owen
|
|
|
need wall brace engineering for the front of house not to cover this area.
|
INSP - Foundation | 10/8/1998 | 10/9/1998 | 10/9/1998 | A | CANC |
Russ Owen
|
|
|
10/09/98 407 - this was done pm yesterday.,
|