INSP - Final | 1/11/1999 | 1/12/1999 | 1/12/1999 | P | PASS |
Russ Owen
|
|
|
01/12/99 407 - Scheduled by Hello!. Contact phone is [2303001].
|
INSP - Letter of compliance | 1/12/1999 | 1/12/1999 | 1/12/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#16355
|
INSP - Letter of compliance | 1/12/1999 | 1/12/1999 | 1/12/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#16355
|
INSP - Wall cover | 12/11/1998 | 12/11/1998 | 12/11/1998 | | FAIL |
Russ Owen
|
|
|
/ / 407 - HAVE NOT COMPLETED REAR GARAGE WALL ENGINEERING CORRECTLY AN
|
INSP - Energy code compliance | 12/7/1998 | 12/7/1998 | 12/7/1998 | P | PASS |
Russ Owen
|
|
|
12/07/98 407 - ADDED 2 HOLD DOWNS.
|
INSP - Framing/Rough-in | 12/1/1998 | 12/2/1998 | 12/2/1998 | P | FAIL |
Russ Owen
|
|
|
12/02/98 407 - has correction.
|
INSP - Framing/Rough-in | 12/1/1998 | 12/2/1998 | 12/1/1998 | A | CANC |
Russ Owen
|
|
|
Scheduled by Hello!. Contact phone is [2303001]. Cancelled by Hello! (Last update by [HLO]). Contact: [2303001].
|
INSP - Framing/Rough-in | 11/20/1998 | 11/20/1998 | 11/20/1998 | P | PART |
Russ Owen
|
|
|
11/20/98 407 - Scheduled by Hello!. Contact phone is [2303001]. had engineer clarify detail for garage shear wall, also they are adding
|
INSP - Framing/Rough-in | 11/17/1998 | 11/18/1998 | 11/19/1998 | A | FAIL |
Russ Owen
|
|
|
11/19/98 407 - need ok for misslocated hold down.
|
INSP - Framing/Rough-in | 11/17/1998 | 11/17/1998 | 11/17/1998 | P | CANC |
Russ Owen
|
|
|
Scheduled by Hello!. Contact phone is [2303001]. Cancelled by Hello! (Last update by [HLO]). Contact: [2303001].
|
INSP - Foundation | 10/7/1998 | 10/8/1998 | 10/8/1998 | A | PASS |
Russ Owen
|
|
|
Failed AM inspection 10/08/98 407 - no plans no persons form boards not complete. re-inspected at PM. And has now passes.
|