INSP - Final | 12/29/1998 | 12/30/1998 | 12/30/1998 | A | PASS |
Russ Owen
|
|
|
12/30/98 407 - discused the issue of drainage at the front with contract
|
INSP - Letter of compliance | 12/30/1998 | 12/30/1998 | 12/30/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#16357.
|
INSP - Letter of compliance | 12/30/1998 | 12/30/1998 | 12/30/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#16357.
|
INSP - Final | 12/23/1998 | 12/28/1998 | 12/29/1998 | P | CANC |
Russ Owen
|
|
|
12/30/98 407 - this is a duplicate insp?
|
INSP - Framing/Rough-in | 11/12/1998 | 11/12/1998 | 11/12/1998 | P | PASS |
Russ Owen
|
|
|
ok to side ext.[2303001].
|
INSP - Energy code compliance | 11/10/1998 | 11/10/1998 | 11/10/1998 | A | PASS |
Russ Owen
|
|
|
STEVE ###-####
|
INSP - Framing/Rough-in | 11/10/1998 | 11/10/1998 | 11/10/1998 | P | PART |
Russ Owen
|
|
|
still has crawl space correction.
|
INSP - Framing/Rough-in | 11/5/1998 | 11/6/1998 | 11/6/1998 | P | FAIL |
Russ Owen
|
|
|
left corrections.o!. Contact phone is [2303001].
|
INSP - Framing/Rough-in | 10/27/1998 | 10/27/1998 | 10/27/1998 | P | PASS |
Russ Owen
|
|
|
STEVE ###-#### SHEAR PANEL
|
INSP - Foundation | 10/9/1998 | 10/9/1998 | 10/9/1998 | P | PASS |
Russ Owen
|
|
|
fixed footing at interior side garage added 2nd footing.
|
INSP - Foundation | 10/7/1998 | 10/7/1998 | 10/7/1998 | P | FAIL |
Russ Owen
|
|
|
10/07/98 407 - left correction at interior side garage footing.
|