INSP - Final | 11/10/1998 | 11/10/1998 | 11/10/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
Permanent Occupancy | | 11/10/1998 | 11/10/1998 | | DONE |
|
|
|
|
INSP - Final | 11/9/1998 | 11/10/1998 | 11/9/1998 | A | |
Pat Lass
|
|
|
###-#### DON
|
INSP-Final Inspection | 11/9/1998 | 11/9/1998 | 11/9/1998 | P | PART |
Joe Tawney
|
|
|
11/09/98 406 - DON ###-#### REINSP OK FOR TEMP OCC EMERG LIGHTS, SMOKE SEAL,DUCT DET SUPRV
|
INSP-Final Inspection | 11/5/1998 | 11/6/1998 | 11/6/1998 | P | FAIL |
Joe Tawney
|
|
|
11/06/98 406 - DON ###-#### FINAL FAIL SPKLRS EMERG LIGHTS PENETRATIONS SMOKE SEALS SUPRV DET
|
INSP - Framing/Rough-in | 10/30/1998 | 11/2/1998 | 11/2/1998 | A | PART |
|
|
|
11/02/98 338 - made ok to drop in tiles need permit and eng for rolling
|
INSP-Final Inspection | 10/30/1998 | 11/2/1998 | 11/2/1998 | A | PART |
Joe Tawney
|
|
|
11/02/98 406 - JIM ###-#### FN INSP OK ON SPKLR ROUGH IN
|
INSP - Framing/Rough-in | 10/26/1998 | 10/26/1998 | 10/26/1998 | P | PART |
|
|
|
10/26/98 338 - made ok to cover exit tunnel assy
|
INSP - Conference | 10/20/1998 | 10/20/1998 | 10/20/1998 | | PART |
|
|
|
/ / 338 - MADE OK 15 MIN
|
INSP - Framing/Rough-in | 10/19/1998 | 10/20/1998 | 10/20/1998 | A | PART |
|
|
|
10/20/98 338 - made ok to cover with ele and plm insp blessing fire caul
|
INSP - Framing/Rough-in | 10/14/1998 | 10/15/1998 | 10/15/1998 | A | PART |
|
|
|
10/15/98 338 - DON ###-#### PARTIAL made ok to cover the interior walls
|