INSP - Final | 4/13/1999 | 4/13/1999 | 4/13/1999 | P | PASS |
Tom Arcoraci
|
|
|
04/13/99 408 - Don ###-####
|
INSP - Final | 10/19/1998 | 10/19/1998 | 10/19/1998 | P | CANC |
Jim Sly
|
|
|
10/19/98 316 - Should be Re-framing insp.....
|
INSP - Framing/Rough-in | 10/19/1998 | 10/19/1998 | 10/19/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 10/15/1998 | 10/16/1998 | 10/16/1998 | P | PASS |
Jim Sly
|
|
|
10/16/98 316 - DON ###-####
|
INSP - Framing/Rough-in | 10/14/1998 | 10/15/1998 | 10/15/1998 | A | PART |
Jim Sly
|
|
|
10/15/98 316 - Shear wall OK....Need all trade R.I. appr befor calling f
|
INSP - Framing/Rough-in | 10/12/1998 | 10/12/1998 | 10/12/1998 | P | FAIL |
Jim Sly
|
|
|
10/12/98 316 - C/N...Need to complete nailing of HDs
|
INSP - Foundation | 9/3/1998 | 9/4/1998 | 9/4/1998 | A | FAIL |
Jim Sly
|
|
|
09/04/98 316 - Foot width,height,soil OK..setbks appear OK but no appr p
|