INSP - Final | 12/9/1998 | 12/9/1998 | 12/9/1998 | P | PASS |
Carl Dependahl
|
|
|
Took for Wes...l/c issued.
|
INSP - Final | 12/8/1998 | 12/9/1998 | 12/9/1998 | P | FAIL |
Wes Worcester
|
|
|
TIM DIGITAL ###-#### FN INSP Carl is reschedule in
|
INSP - Final | 12/8/1998 | 12/8/1998 | 12/8/1998 | P | FAIL |
Carl Dependahl
|
|
|
TIM ###-#### DIGITAL PAGER FN FOR OCC need floor insul per mec check
|
INSP - Energy code compliance | 10/27/1998 | 10/28/1998 | 10/28/1998 | P | PASS |
Carl Dependahl
|
|
|
###-#### TIM
|
INSP - Framing/Rough-in | 10/27/1998 | 10/27/1998 | 10/27/1998 | P | PART |
Carl Dependahl
|
|
|
tim ###-####, need complete air seal, wattsun. ok to ins.
|
INSP - Framing/Rough-in | 10/21/1998 | 10/21/1998 | 10/21/1998 | P | PART |
Carl Dependahl
|
|
|
TIM- ###-#### SHEAR WALL INSP...c/n ok to place siding
|
INSP - Framing/Rough-in | 10/19/1998 | 10/20/1998 | 10/20/1998 | A | FAIL |
Carl Dependahl
|
|
|
SHEAR WALL / ###-####...need fasten straps to dbl studs per spec
|
INSP - Foundation | 9/21/1998 | 9/21/1998 | 9/21/1998 | P | NR |
Carl Dependahl
|
|
|
dane ###-#### no plans or stringline. poured.
|