INSP - Final | 12/4/1998 | 12/4/1998 | 12/4/1998 | P | PASS |
Jim Storey
|
|
|
12/04/98 301 - FNL -OK FINAL
|
Permanent Occupancy | | 12/4/1998 | 12/4/1998 | | DONE |
|
|
|
|
INSP - Final | 12/1/1998 | 12/2/1998 | 12/3/1998 | P | FAIL |
Jim Storey
|
|
|
12/02/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Final Inspection | 12/1/1998 | 12/2/1998 | 12/2/1998 | A | PASS |
Rick Jackson
|
|
|
BRIAN ELLSWORTH CELL ###-####-FN INSP-PESKY OFFICE-2ND FLOOR occ approved
|
INSP - Final | 11/24/1998 | 11/25/1998 | 11/25/1998 | P | CANC |
Jim Storey
|
|
|
11/25/98 301 - calleed and canc.
|
INSP - Final | 11/4/1998 | 11/5/1998 | 11/5/1998 | P | PART |
Russ Owen
|
|
|
temporary issued. still need to install a window in corridor wall.
|
INSP-Final Inspection | 11/4/1998 | 11/5/1998 | 11/5/1998 | A | PASS |
Joe Tawney
|
|
|
11/05/98 406 - BRAD ###-#### FINAL OK FOR PERM OCC
|
INSP - Final | 10/30/1998 | 11/2/1998 | 11/2/1998 | A | FAIL |
Jim Storey
|
|
|
11/02/98 301 - work in progess fire stopping, window assembly installed
|
INSP - Final | 11/2/1998 | 11/2/1998 | 11/2/1998 | A | FAIL |
Jim Storey
|
|
|
11/02/98 301 - doubled up insp. requisted.
|
INSP - Final | 10/29/1998 | 10/30/1998 | 10/30/1998 | P | FAIL |
|
|
|
10/30/98 333 - LINDA ###-####
|
INSP - Framing/Rough-in | 10/19/1998 | 10/19/1998 | 10/19/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRAM-OK FRAMING
|
INSP - Wall cover | 10/15/1998 | 10/16/1998 | 10/16/1998 | P | PART |
Jim Storey
|
|
|
10/16/98 301 - Scheduled by Hello!. Contact phone is [8673887]. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|