INSP - Final | 12/10/1998 | 12/10/1998 | 12/10/1998 | | PASS |
Jim Sly
|
|
|
12/10/98 316 - ###-#### DENNIS
|
Permanent Occupancy | | 12/10/1998 | 12/10/1998 | | DONE |
|
|
|
|
INSP - Final | 11/16/1998 | 11/16/1998 | 11/16/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR TEMP OCC OVERSPACED SPKLR HDS, FIRE EXT, EMERG
|
INSP - Framing/Rough-in | 11/3/1998 | 11/4/1998 | 11/4/1998 | A | PASS |
Jim Sly
|
|
|
11/04/98 316 - CEILING and insp of firestops in rated corridor wall....O
|
INSP-Final Inspection | 10/28/1998 | 10/28/1998 | 10/28/1998 | P | NR |
Joe Tawney
|
|
|
10/28/98 406 - odie- ###-#### fn -call 1st FINAL NOT READY
|
INSP - Wall cover | 10/21/1998 | 10/21/1998 | 10/22/1998 | P | FAIL |
Jim Sly
|
|
|
10/22/98 316 - CEILING COVER C/N...Need Mech corr prior to cover...call
|
INSP - Framing/Rough-in | 9/29/1998 | 9/29/1998 | 9/29/1998 | P | FAIL |
Jim Sly
|
|
|
09/29/98 316 - C/N...Need all trade rough in approvals...verify....penit
|