INSP - Final | 11/19/1998 | 11/20/1998 | 11/20/1998 | A | PASS |
Tom Arcoraci
|
|
|
11/20/98 408 - ALLEN ###-#### FN OCC INSP -LOCK BOX ON FRONT-SPI FOR ACC
|
INSP - Framing/ Rough-in | 10/30/1998 | 10/30/1998 | 10/30/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Flatwork | 10/26/1998 | 10/26/1998 | 10/26/1998 | | PART |
Jim Sly
|
|
|
/ / 316 - Slab and slab reinforcment..OK
|
INSP - Framing/ Rough-in | 10/26/1998 | 10/26/1998 | 10/26/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Energy code compliance | 10/22/1998 | 10/23/1998 | 10/23/1998 | P | FAIL |
Jim Sly
|
|
|
10/23/98 352 - NR....
|
INSP - Framing/Rough-in | 10/22/1998 | 10/23/1998 | 10/23/1998 | P | FAIL |
Jim Sly
|
|
|
10/23/98 352 - Left note...Still need Engineers fix for missed HDs per (
|
INSP - Framing/Rough-in | 10/21/1998 | 10/22/1998 | 10/22/1998 | P | FAIL |
Jim Sly
|
|
|
10/22/98 316 - C/N...Need Engineers fix for missed HDs at Bedrm #2 per p
|
INSP - Framing/Rough-in | 10/14/1998 | 10/15/1998 | 10/15/1998 | A | PART |
Jim Sly
|
|
|
10/15/98 316 - C/N...Engineer to provide fix for missed HDs at Bedrm #2.
|
INSP - Foundation | 9/25/1998 | 9/26/1998 | 9/25/1998 | A | |
Jim Sly
|
|
|
JOHN ###-#### THEN DIAL 19181
|