INSP - Final | 8/30/1999 | 9/3/1999 | 9/3/1999 | P | FAIL |
|
|
|
09/03/99 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Final | 9/3/1999 | 9/3/1999 | 9/3/1999 | P | PART |
Jim Storey
|
|
|
09/03/99 301 - ok to occupy house
|
INSP - Energy code compliance | 3/25/1999 | 3/29/1999 | 3/29/1999 | P | PART |
|
|
|
03/29/99 338 - made ok to start cover
|
INSP - Framing/Rough-in | 3/25/1999 | 3/26/1999 | 3/25/1999 | A | |
|
|
|
###-#### V PGR//FOAMING & CAULKING LATE AM
|
INSP - Framing/Rough-in | 3/24/1999 | 3/25/1999 | 3/25/1999 | A | PART |
Jim Storey
|
|
|
03/25/99 301 - need air infiltration and plan review fo egress window re
|
INSP - Foundation | 1/4/1999 | 1/4/1999 | 1/4/1999 | P | PART |
Carl Dependahl
|
|
|
sear cafferty -needed at ft-should not have been fr-needed today? ###-#### voice pager #...east side, ftgs poured, says he took photos
|
INSP - Framing/Rough-in | 1/4/1999 | 1/4/1999 | 1/4/1999 | P | FAIL |
Carl Dependahl
|
|
|
sheer wall Sean Cafferty voice pager ###-####-for foundation insp frame not completed at either portion of job, discussed procedure w/ carprnter, no c/n (yet). 301 area.
|
INSP - Foundation | 12/18/1998 | 12/18/1998 | 12/18/1998 | P | PASS |
|
|
|
12/18/98 333 - FTG -OK FOOTING
|
INSP - Foundation | 10/19/1998 | 10/20/1998 | 10/20/1998 | A | FAIL |
Jim Storey
|
|
|
10/20/98 301 - robert- ###-####-fd insp spec 4000 psi concrete, contractor to supply recalulation to 2500 psi by or engineer of record. 3500 psi ordered and on site. rebar in place and ok, hold down bolts ok
|
INSP - Foundation | 10/7/1998 | 10/8/1998 | 10/8/1998 | A | FAIL |
Russ Owen
|
|
|
10/08/98 407 - poured before inspection,contractor states he has in plac footing as called out on plans.
|