INSP - Final | 2/23/1999 | 2/23/1999 | 2/23/1999 | P | PASS |
Jim Sly
|
|
|
02/23/99 316 - C/C # 13816
|
INSP - Energy code compliance | 1/12/1999 | 1/12/1999 | 1/12/1999 | P | PASS |
Jim Sly
|
|
|
01/12/99 316 - Already completed 12/98
|
INSP - Energy code compliance | 12/22/1998 | 12/22/1998 | 12/22/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 12/21/1998 | 12/21/1998 | 12/21/1998 | P | PASS |
Jim Sly
|
|
|
12/21/98 316 - Larry ###-####
|
INSP - Framing/Rough-in | 12/17/1998 | 12/17/1998 | 12/17/1998 | | FAIL |
Jim Sly
|
|
|
/ / 316 - COMPLETE PREV CORR NOTICE
|
INSP - Framing/Rough-in | 12/16/1998 | 12/16/1998 | 12/17/1998 | P | CANC |
Russ Owen
|
|
|
12/17/98 407 - trans to 316.
|
INSP - Framing/Rough-in | 12/14/1998 | 12/15/1998 | 12/15/1998 | A | FAIL |
Jim Sly
|
|
|
12/15/98 316 - C/N...Need Mech...and corrections too many to list.
|
INSP - Framing/Rough-in | 11/24/1998 | 11/25/1998 | 11/25/1998 | A | PART |
Jim Sly
|
|
|
11/25/98 316 - Shear wall OK.....
|
INSP - Framing/Rough-in | 11/23/1998 | 11/24/1998 | 11/24/1998 | A | FAIL |
Jim Sly
|
|
|
11/24/98 316 - C/N..Need eng for missed HDs..renail shear..use 16d on st
|
INSP - Footings | 10/5/1998 | 10/5/1998 | 10/5/1998 | | FAIL |
Jim Sly
|
|
|
/ / 316 - Foot width,height,soil,contfoot&reinforc OK..setbks appear O
|
INSP - Framing/Rough-in | 10/1/1998 | 10/1/1998 | 10/5/1998 | P | PASS |
Jim Sly
|
|
|
10/05/98 316 - OK
|
INSP - Framing/Rough-in | 10/1/1998 | 10/1/1998 | 10/1/1998 | | NR |
Jim Sly
|
|
|
10/01/98 316 - NR
|