INSP - Final | 12/3/1998 | 12/4/1998 | 12/4/1998 | A | PASS |
|
|
|
12/04/98 333 - FNL -OK FINAL
|
Permanent Occupancy | | 12/3/1998 | 12/3/1998 | | DONE |
|
|
|
|
INSP - Final | 11/18/1998 | 11/18/1998 | 11/18/1998 | | PART |
|
|
|
11/18/98 333 - ok for temp other signatures needed
|
INSP - Final | 11/5/1998 | 11/5/1998 | 11/5/1998 | P | FAIL |
Carl Dependahl
|
|
|
heather ###-####...c/n, need remove/disable 2nd latch at add'l front door. OK for t/o, signed card...has bond for P&Z issues as well.
|
INSP - Final | 11/3/1998 | 11/4/1998 | 11/4/1998 | A | NR |
Carl Dependahl
|
|
|
HEATHER ###-#### carl there is a cn on this and dave L is to look at the heating per george; NEED OTHER OK'S, WILL CHK W/ DAVE L. RECALL WHEN READY
|
INSP - Final | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | FAIL |
|
|
|
10/30/98 333 - HEATHER ###-#### AT 4PM WILL BE READY CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Final Inspection | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | PASS |
Rick Jackson
|
|
|
HEATHER ###-#### FN FIRE-1:00 ? FOR INSP
|
INSP - Final | 10/23/1998 | 10/26/1998 | 10/26/1998 | A | PART |
|
|
|
roof only 10/26/98 333 - FNL -OK FINAL
|
INSP-Sprinkler Rough-in/Hydro | 10/21/1998 | 10/22/1998 | 10/22/1998 | P | FAIL |
Rick Jackson
|
|
|
HEATHER ###-#### AT 2PM PLEASE door hardware for main exit
|
INSP - Framing/Rough-in | 10/16/1998 | 10/16/1998 | 10/16/1998 | | PART |
|
|
|
10/16/98 333 - conf on plan req
|
INSP - Framing/Rough-in | 10/15/1998 | 10/15/1998 | 10/15/1998 | P | FAIL |
|
|
|
10/15/98 333 - per steve
|