BLD-Final | 9/29/1999 | 9/29/1999 | 9/29/1999 | | PASS |
|
|
|
occ req card signoff Signed STR perm. Col.
|
Permanent Occupancy | | 9/29/1999 | 9/29/1999 | | DONE |
|
|
|
|
INSP - Final | 2/18/1999 | 2/19/1999 | 2/22/1999 | P | PART |
Alan Hauser
|
|
|
02/19/99 350 - part only
|
INSP-Alarm Testing | 2/18/1999 | 2/19/1999 | 2/19/1999 | A | PASS |
Joe Tawney
|
|
|
02/19/99 406 - fire & life safety ###-#### Devin FINAL OK FOR PERM OCC
|
INSP - Wall cover | 1/4/1999 | 1/5/1999 | 1/5/1999 | A | PASS |
|
|
|
01/05/99 338 - made ok to cover
|
INSP - Framing/Rough-in | 12/31/1998 | 12/31/1998 | 12/31/1998 | P | CANC |
Tom Arcoraci
|
|
|
12/31/98 408 - devin- ###-#### cell # fr insp DONE BY 407
|
INSP - Framing/Rough-in | 10/7/1998 | 10/8/1998 | 10/8/1998 | A | PASS |
|
|
|
10/08/98 338 - made ok r-bar is placed
|
INSP - Foundation | 10/5/1998 | 10/5/1998 | 10/5/1998 | P | PART |
|
|
|
10/05/98 338 - made ok to pour r-bar placed
|