BLD-Final | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | PASS |
|
|
|
JAY ###-#### L/C issued #18289
|
BLD-Conference | 12/1/1999 | 12/1/1999 | 12/1/1999 | | PASS |
|
|
|
Talked w/Marv Meyer & Leonard re: status of temp. occ.
|
BLD-Final | 9/28/1999 | 9/29/1999 | 9/30/1999 | P | FAIL |
|
|
|
L:eonard ###-#### Ok for temp. occ. For shell only
|
FIRE-Final Inspection | 9/28/1999 | 9/29/1999 | 9/29/1999 | P | FAIL |
Rick Jackson
|
|
|
Leonard Butler ###-#### Need UL listing info for smoke guard doors
|
FIRE-Final Inspection | 9/22/1999 | 9/28/1999 | 9/28/1999 | A | FAIL |
Rick Jackson
|
|
|
###-#### Test elevator recall/smoke guard; Stair tower door closures; Sprinkler problems; Penetrations in rated ceiling
|
BLD-Other | 9/24/1999 | 9/24/1999 | 9/24/1999 | A | PART |
|
|
|
recieved notice requesting not to sign occ w/o parks dept ok
|
BLD-Framing/Rough-in | 9/23/1999 | 9/23/1999 | 9/23/1999 | A | PART |
|
|
|
CEILING GRID INSP.provide suport for main runner in the long hall, perimeter wires , and diffuser attachment required c/n issued
|
INSP-Final Inspection | 9/9/1999 | 9/10/1999 | 9/10/1999 | P | FAIL |
Rick Jackson
|
|
|
SPRINKLER HYDRO OK, NOT A FINAL INSPECTION
|
INSP-Supply line flush | 9/1/1999 | 9/1/1999 | 9/1/1999 | P | PASS |
Rick Jackson
|
|
|
underground flush okay
|
INSP - Framing/Rough-in | 8/26/1999 | 8/27/1999 | 8/27/1999 | A | PART |
|
|
|
08/30/99 338 - Jay ###-####
|
INSP-Conference | 8/23/1999 | 8/23/1999 | 8/23/1999 | A | PART |
|
|
|
on the accessability issue
|
INSP - Framing/Rough-in | 8/17/1999 | 8/18/1999 | 8/18/1999 | A | NR |
Jim Storey
|
|
|
08/18/99 301 - 1 HR. ASSEMBLY. JAY ###-####
|
INSP - Framing/Rough-in | 8/4/1999 | 8/6/1999 | 8/5/1999 | A | PART |
|
|
|
08/06/99 338 - corridor questions
|
INSP - Framing/Rough-in | 7/27/1999 | 7/27/1999 | 7/27/1999 | P | PART |
|
|
|
07/27/99 338 - conf on rated corridor walls and for the lobby protection
|
INSP - Framing/Rough-in | 7/9/1999 | 7/12/1999 | 7/12/1999 | A | PART |
|
|
|
07/12/99 338 - made okkto cover the exterior soffits
|
INSP - Framing/Rough-in | 6/22/1999 | 6/22/1999 | 6/22/1999 | P | PART |
|
|
|
06/22/99 338 - ceiling closure Jay --DISCUSSED THE PROPOSED METHOD FOR T
|
INSP - Wall cover | 6/11/1999 | 6/14/1999 | 6/14/1999 | A | PART |
|
|
|
06/14/99 338 - madeok to cover
|
INSP - Framing/Rough-in | 6/4/1999 | 6/7/1999 | 6/7/1999 | A | PART |
|
|
|
06/07/99 338 - madeto insuLATE AS NECESSARY AND THE ELEL INSP IS SIGNED
|
INSP - Framing/Rough-in | 5/24/1999 | 5/25/1999 | 5/25/1999 | P | PART |
|
|
|
05/25/99 338 - madeok for the cover of the outside of the 2-hour shaft
|
INSP - Framing/Rough-in | 5/18/1999 | 5/19/1999 | 5/19/1999 | A | PART |
|
|
|
05/19/99 338 - reviewed the framing pending assembly design for the meta
|
INSP - Framing/Rough-in | 4/29/1999 | 4/29/1999 | 4/29/1999 | P | |
|
|
|
###-#### JAY//MISC.
|
INSP - Framing/Rough-in | 4/26/1999 | 4/26/1999 | 4/26/1999 | P | PART |
|
|
|
04/26/99 338 - OK TO CONTINUE AS IS
|
INSP-Conference | 4/22/1999 | 4/22/1999 | 4/22/1999 | P | PART |
Rick Jackson
|
|
|
left c/n for completion of standpipe due by 4/29
|
INSP - Framing/Rough-in | 3/24/1999 | 3/25/1999 | 3/24/1999 | A | |
|
|
|
###-#### JAY//FIRE CAULKING IN AIR SHAFT
|
INSP - Concrete | 3/16/1999 | 3/16/1999 | 3/16/1999 | P | PART |
Jim Storey
|
|
|
03/16/99 301 - JAY ###-#### STRUCTURAL SLAB 4TH FLOOR AND ROOF work in progess 4 th floor pending special insp. approval and roof ok at
|
INSP - Framing/Rough-in | 2/26/1999 | 3/1/1999 | 3/1/1999 | A | PART |
|
|
|
03/01/99 338 - made ok to pour 3rd floor with sp insp approvals
|
INSP - Framing/Rough-in | 2/26/1999 | 2/26/1999 | 2/26/1999 | | PART |
|
|
|
02/25/99 338 - WALKED THE 2ND FLOOR DECK OBSERVED THE INSTALL OF THE FLO
|
INSP-Conference | 2/1/1999 | 2/1/1999 | 2/1/1999 | P | PART |
Rick Jackson
|
|
|
no sprinkler plans
|
INSP - Framing/Rough-in | 1/26/1999 | 1/27/1999 | 1/27/1999 | A | PART |
|
|
|
JAY ###-#### REBAR bond beam made ok with sp insp approval
|
INSP - Framing/Rough-in | 1/15/1999 | 1/19/1999 | 1/19/1999 | A | PART |
|
|
|
01/19/99 338 - made ok with sp insp approval
|
INSP - Framing/Rough-in | 1/13/1999 | 1/14/1999 | 1/14/1999 | A | PART |
|
|
|
01/14/99 338 - MADE OK WITH SP INSP APPROVAL
|
INSP - Framing/Rough-in | 1/12/1999 | 1/12/1999 | 1/12/1999 | P | PART |
|
|
|
01/12/99 333 - masonry ol
|
INSP - Framing/Rough-in | 1/8/1999 | 1/11/1999 | 1/11/1999 | A | PART |
|
|
|
01/11/99 338 - made k with sp insp approval
|
INSP - Framing/Rough-in | 1/5/1999 | 1/6/1999 | 1/6/1999 | A | PART |
|
|
|
01/06/99 333 - JAY ###-#### REBAR
|
INSP - Framing/Rough-in | 12/28/1998 | 12/29/1998 | 12/29/1998 | A | PART |
|
|
|
12/29/98 333 - masonry pour ok
|
INSP - Framing/Rough-in | 12/17/1998 | 12/18/1998 | 12/18/1998 | A | PART |
|
|
|
12/18/98 333 - OK PEND SPECIAL INSP REPORT
|
INSP - Framing/Rough-in | 12/11/1998 | 12/14/1998 | 12/14/1998 | A | PART |
|
|
|
12/14/98 333 - 12 foot ok
|
INSP - Framing/Rough-in | 12/8/1998 | 12/9/1998 | 12/9/1998 | A | PART |
|
|
|
12/09/98 333 - masonry ok
|
INSP - Framing/Rough-in | 12/7/1998 | 12/8/1998 | 12/8/1998 | A | PART |
|
|
|
12/08/98 333 - second pour ok pend special insp reports
|
INSP - Framing/Rough-in | 12/1/1998 | 12/2/1998 | 12/2/1998 | A | PART |
|
|
|
12/02/98 333 - first pour of masonry pending special insp reports
|
INSP - Framing/Rough-in | 11/30/1998 | 12/1/1998 | 12/1/1998 | A | PART |
|
|
|
12/01/98 333 - stem wall
|
INSP - Framing/Rough-in | 11/24/1998 | 11/25/1998 | 11/25/1998 | A | PART |
|
|
|
11/25/98 333 - stem wall insp
|
INSP - Foundation | 11/19/1998 | 11/20/1998 | 11/20/1998 | A | PART |
|
|
|
11/20/98 333 - stem wall ok pend special insp report
|