INSP - Final | 3/31/1999 | 4/1/1999 | 4/1/1999 | P | PASS |
Jim Sly
|
|
|
04/01/99 316 - C/C # 13104
|
INSP - Energy code compliance | 1/21/1999 | 1/22/1999 | 1/22/1999 | P | PASS |
Carl Dependahl
|
|
|
01/22/99 340 - Scheduled by Hello!.
|
INSP - Framing/Rough-in | 1/21/1999 | 1/22/1999 | 1/22/1999 | P | PASS |
Carl Dependahl
|
|
|
01/22/99 340 - Scheduled by Hello!. c/n ok
|
INSP - Framing/Rough-in | 1/20/1999 | 1/20/1999 | 1/20/1999 | | FAIL |
Russ Owen
|
|
|
/ / 407 - LEFT 1 CORRECTION.
|
INSP - Framing/Rough-in | 12/30/1998 | 12/30/1998 | 12/30/1998 | P | PART |
Jim Sly
|
|
|
12/30/98 316 - Shear wall OK
|