BLD-Framing/Rough-in | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | PASS |
Russ Owen
|
|
|
bill ###-#### ok as no electrical in at this time, said none was going in
|
INSP - Framing/Rough-in | 9/7/1999 | 9/8/1999 | 9/8/1999 | | PASS |
Jim Storey
|
|
|
willaim -- homeowner fr insp; 9/8 Frame ok C/N to check on final. jrb
|
INSP - Framing/Rough-in | 9/7/1999 | 9/8/1999 | 9/8/1999 | | PASS |
Jim Storey
|
|
|
9/8 Went out - was dupe w AM workorder due to no am/pm specified. jrb
|
INSP - Framing/Rough-in | 9/7/1999 | 9/7/1999 | 9/7/1999 | P | PART |
Russ Owen
|
|
|
Bill Messer ###-####; 9/7 Built as per plans, will need interior straps at top plate breaks. jrb
|
INSP - Framing/Rough-in | 2/1/1999 | 2/1/1999 | 2/1/1999 | P | PART |
Jim Storey
|
|
|
02/01/99 301 - CONF OK WORK IN PROGESS
|
INSP - Framing/Rough-in | 1/28/1999 | 1/29/1999 | 2/1/1999 | A | PART |
Jim Storey
|
|
|
01/29/99 301 - conf. ok
|
INSP - Foundation | 10/29/1998 | 10/29/1998 | 10/29/1998 | P | PASS |
Russ Owen
|
|
|
BILL ###-####
|
INSP - Foundation | 10/27/1998 | 10/28/1998 | 10/28/1998 | P | FAIL |
Jim Storey
|
|
|
10/28/98 301 - william messer-###-#### ft insp
|
INSP - Foundation | 10/28/1998 | 10/28/1998 | 10/28/1998 | P | FAIL |
Russ Owen
|
|
|
needs depth for frost.
|