INSP - Final | 7/1/1999 | 7/2/1999 | 7/2/1999 | A | FAIL |
Alan Hauser
|
|
|
07/02/99 350 - corrections posted
|
INSP - Framing/Rough-in | 3/8/1999 | 3/8/1999 | 3/8/1999 | P | CANC |
Jim Sly
|
|
|
03/08/99 316 - Done by Tom A.
|
INSP - Framing/Rough-in | 3/3/1999 | 3/3/1999 | 3/3/1999 | | FAIL |
Jim Sly
|
|
|
03/03/99 316 - C/N...Straps at top plates
|
INSP - Framing/Rough-in | 2/16/1999 | 2/16/1999 | 2/16/1999 | P | PART |
Jim Sly
|
|
|
02/16/99 316 - Shear wall only.......OK
|
INSP - Framing/Rough-in | 2/9/1999 | 2/9/1999 | 2/9/1999 | P | FAIL |
Jim Sly
|
|
|
02/09/99 316 - Need appr plans for shear....OK to side gar front,sides,
|
INSP - Foundation | 11/12/1998 | 11/12/1998 | 11/12/1998 | P | PASS |
Jim Sly
|
|
|
11/12/98 316 - TODD ###-#### ì
|