INSP - Framing/Rough-in | 3/30/1999 | 3/30/1999 | 3/30/1999 | | PASS |
|
|
|
Framing approved at time of energy code inspection
|
INSP - Final | 3/29/1999 | 3/29/1999 | 3/29/1999 | P | PASS |
Tom Arcoraci
|
|
|
03/29/99 408 - john ###-####
|
INSP - Framing/Rough-in | 3/29/1999 | 3/29/1999 | 3/29/1999 | P | CANC |
Tom Arcoraci
|
|
|
03/29/99 408 - NOT A FRAME INSP
|
INSP - Energy code compliance | 2/22/1999 | 2/24/1999 | 2/24/1999 | P | PASS |
Jim Sly
|
|
|
02/24/99 316 -
|
INSP - Framing/Rough-in | 2/22/1999 | 2/23/1999 | 2/23/1999 | P | FAIL |
Jim Sly
|
|
|
02/23/99 316 - C/N...Need plumb R.I.
|
INSP - Foundation | 11/2/1998 | 11/3/1998 | 11/4/1998 | A | PASS |
Tom Arcoraci
|
|
|
11/03/98 408 - DANE 1-###-####
|