BLD-Grading Inspection | 12/8/1999 | 12/8/1999 | 12/8/1999 | | PASS |
Rita DeYoung
|
|
|
Final grading and revegetation have been completed and the $1500.00 bond can be released.
|
INSP - Final | 6/15/1999 | 6/16/1999 | 6/16/1999 | A | PASS |
Wes Worcester
|
|
|
06/16/99 342 - John ###-#### c/c issued
|
INSP - Grading Inspection | 6/15/1999 | | 6/15/1999 | | BOND |
Rita DeYoung
|
|
|
Grading has been revised, necessitating an as built grading plan. Roof gutters must be revised to route roof runoff to the street. Hydroseeding has been applied but has not been established. For these items a $1500.00 surety is required. Upon receipt of this surety the grading is conditionally approved.
|
INSP - Energy code compliance | 3/15/1999 | 3/15/1999 | 3/15/1999 | P | PASS |
Wes Worcester
|
|
|
03/15/99 342 - JOHN ###-####
|
INSP - Framing/Rough-in | 3/10/1999 | 3/11/1999 | 3/11/1999 | A | FAIL |
Wes Worcester
|
|
|
03/11/99 342 - ###-#### JOHN//RI FRAMING truss engineering
|
INSP - Foundation | 1/5/1999 | 1/5/1999 | 1/5/1999 | P | PASS |
Wes Worcester
|
|
|
01/05/99 342 - STEVE ###-#### ok w/soils report to be maintained on file
|
INSP - Foundation | 12/18/1998 | 12/18/1998 | 12/18/1998 | P | PART |
Wes Worcester
|
|
|
12/18/98 342 - steve ###-#### ft insp
|
INSP - Foundation | 12/17/1998 | 12/17/1998 | 12/17/1998 | P | PART |
Wes Worcester
|
|
|
|
INSP - Foundation | 12/9/1998 | 12/10/1998 | 12/10/1998 | A | PART |
Wes Worcester
|
|
|
STEVE ###-#### FT INSP
|