BLD-Final | 10/13/1999 | 10/13/1999 | 10/13/1999 | P | PASS |
Wes Worcester
|
|
|
Requested for early afternoon; Troy- ###-####
|
BLD-Final | 10/11/1999 | 10/12/1999 | 10/12/1999 | A | FAIL |
Wes Worcester
|
|
|
Troy ###-#### handrail, guardrail, G.W.B. 7" o/e; caulk outlet boxes, 6" min ???
|
BLD-Grading Inspection | 10/11/1999 | 10/11/1999 | 10/11/1999 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage complete and according to plan. Reveg or landscaping has not been done, but threat of erosion is very minimal and no runoff can leave the lot because of the way it is graded and the berm at the top of the slope.
|
INSP - Energy code compliance | 6/15/1999 | 6/16/1999 | 6/16/1999 | P | PASS |
|
|
|
06/16/99 338 - made ok to cover
|
INSP - Framing/Rough-in | 6/15/1999 | 6/16/1999 | 6/16/1999 | P | PASS |
|
|
|
06/16/99 338 - madeok to cover c/n removed
|
INSP - Framing/Rough-in | 6/11/1999 | 6/14/1999 | 6/14/1999 | A | FAIL |
|
|
|
06/14/99 338 - ok to ins only verbal corrections taking approved plans b
|
INSP - Framing/Rough-in | 5/27/1999 | 5/28/1999 | 5/28/1999 | A | PART |
Wes Worcester
|
|
|
05/27/99 342 - sheer inspection Randy ###-#### address rear wal mst str
|
INSP - Framing/Rough-in | 5/26/1999 | 5/27/1999 | 5/27/1999 | A | FAIL |
Wes Worcester
|
|
|
05/27/99 342 - ###-####//SHEAR WALL need approved plan
|
INSP - Foundation | 4/21/1999 | 4/22/1999 | 4/22/1999 | A | PASS |
Wes Worcester
|
|
|
04/21/99 342 - late am Randy ###-####
|
INSP - Foundation | 4/16/1999 | 4/19/1999 | 4/19/1999 | A | PASS |
Wes Worcester
|
|
|
04/19/99 342 - RANDY--###-#### FT INSP
|