INSP - Final | 1/19/1999 | 1/20/1999 | 1/20/1999 | P | PASS |
|
|
|
made ok for perm signed the perm col told ctr of the 400$+ fee due on ele
|
INSP-Final Inspection | 1/19/1999 | 1/20/1999 | 1/20/1999 | A | PASS |
Rick Jackson
|
|
|
01/20/99 409 - BOB...###-#### occ approved
|
Permanent Occupancy | | 1/20/1999 | 1/20/1999 | | DONE |
|
|
|
|
INSP - Framing/Rough-in | 1/8/1999 | 1/8/1999 | 1/8/1999 | P | PASS |
|
|
|
01/08/99 333 - ceiling ok
|
INSP - Framing/Rough-in | 12/21/1998 | 12/22/1998 | 12/22/1998 | A | PASS |
|
|
|
12/22/98 333 - frame on all ok
|
INSP - Framing/Rough-in | 12/15/1998 | 12/16/1998 | 12/16/1998 | A | PART |
|
|
|
12/16/98 333 - south west half ok
|
INSP - Framing/Rough-in | 12/14/1998 | 12/15/1998 | 12/15/1998 | A | PART |
|
|
|
12/15/98 333 - CONFERENCE ON DRAFT STOPS
|