INSP - Final | 1/27/1999 | 1/28/1999 | 1/28/1999 | A | PASS |
Russ Owen
|
|
|
01/28/99 407 - CRAWL SPCE INSULATION TO BE STRAIGHTEND UP PER CONTRACTOR
|
INSP - Letter of compliance | 1/28/1999 | 1/28/1999 | 1/28/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14561.
|
INSP - Letter of compliance | 1/28/1999 | 1/28/1999 | 1/28/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14561.
|
INSP - Final | 1/26/1999 | 1/27/1999 | 1/27/1999 | P | FAIL |
Jim Sly
|
|
|
01/27/99 316 - C/N...Load hinges, Found insul
|
INSP - Energy code compliance | 12/17/1998 | 12/18/1998 | 12/21/1998 | P | PASS |
Tom Arcoraci
|
|
|
12/18/98 408 - ALAN ###-####
|
INSP - Framing/Rough-in | 12/17/1998 | 12/18/1998 | 12/18/1998 | P | PASS |
Jim Sly
|
|
|
12/18/98 316 -
|
INSP - Framing/Rough-in | 12/16/1998 | 12/17/1998 | 12/18/1998 | P | FAIL |
Tom Arcoraci
|
|
|
12/17/98 408 - ALAN ###-#### FR INSP
|
INSP - Framing/Rough-in | 12/10/1998 | 12/11/1998 | 12/11/1998 | A | PART |
Jim Sly
|
|
|
12/11/98 316 - Shear wall OK
|
INSP - Framing/Rough-in | 12/10/1998 | 12/10/1998 | 12/10/1998 | | FAIL |
Jim Sly
|
|
|
12/10/98 316 - C/N...HDs Not as per approved plan...(shear wall insp).
|
INSP - Foundation | 11/16/1998 | 11/16/1998 | 11/17/1998 | P | FAIL |
Jim Sly
|
|
|
11/16/98 316 - Foot width, height, soil OK...Setbks?..Cont. foot OK..No
|