INSP - Framing/Rough-in | 2/10/1999 | 2/10/1999 | 2/10/1999 | P | PASS |
Carl Dependahl
|
|
|
02/10/99 340 - ###-#### perry reinspection
|
INSP - Framing/Rough-in | 2/9/1999 | 2/9/1999 | 2/10/1999 | P | FAIL |
Carl Dependahl
|
|
|
02/09/99 340 - ###-#### PERRY c/n tie ceiling joists
|
INSP - Framing/Rough-in | 2/9/1999 | 2/9/1999 | 2/9/1999 | P | FAIL |
Carl Dependahl
|
|
|
c/n, provide tie at splices at clg joists; ok to continue
|
INSP - Foundation | 12/23/1998 | 12/23/1998 | 12/23/1998 | P | PART |
|
|
|
12/23/98 338 - madeok to pour with confirmation of setback from the slop
|
INSP - Foundation | 12/21/1998 | 12/22/1998 | 12/22/1998 | A | FAIL |
|
|
|
12/22/98 338 - no approved plans on jobsite may be too close to the slop
|