INSP - Final | 5/21/1999 | 5/24/1999 | 5/24/1999 | A | PASS |
Tom Arcoraci
|
|
|
05/24/99 408 - ok for perm
|
Permanent Occupancy | | 5/24/1999 | 5/24/1999 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/20/1999 | 5/21/1999 | 5/21/1999 | A | PASS |
Joe Tawney
|
|
|
05/21/99 406 - FINAL OK FOR PERM OCC
|
INSP - Final | 5/20/1999 | 5/21/1999 | 5/20/1999 | A | |
Carl Dependahl
|
|
|
Scheduled by Hello!. Contact phone is [3277672].
|
INSP - Framing/Rough-in | 5/13/1999 | 5/14/1999 | 5/14/1999 | A | PART |
Carl Dependahl
|
|
|
05/14/99 340 - John ###-#### Tbar inspection; back room, add fasteners a
|
INSP - Framing/Rough-in | 4/22/1999 | 4/23/1999 | 4/26/1999 | A | PART |
Carl Dependahl
|
|
|
04/23/99 340 - need top of cooridor rocked; ok to continue, chk at final
|
INSP-Final Inspection | 4/21/1999 | 4/22/1999 | 4/22/1999 | A | PART |
Joe Tawney
|
|
|
04/22/99 406 - OK ON ROUGH IN OF SPKLRS
|
INSP-Final Inspection | 3/18/1999 | 3/19/1999 | 3/19/1999 | A | PART |
Carl Dependahl
|
|
|
03/19/99 340 - JOHN ###-#### phase 1 ok to occupy pending fire ok
|
INSP - Framing/Rough-in | 3/11/1999 | 3/16/1999 | 3/16/1999 | P | PART |
Carl Dependahl
|
|
|
03/16/99 340 - ###-#### JOHN//PARTIAL FINAL MOVING FROM PHASE I TO PHASE II. ok to move into phase 1
|
INSP-Final Inspection | 2/24/1999 | 2/25/1999 | 2/25/1999 | A | NR |
Carl Dependahl
|
|
|
02/25/99 340 - not ready for final, discussed frame issues
|
INSP - Framing/Rough-in | 2/18/1999 | 2/19/1999 | 2/19/1999 | P | PART |
Jim Storey
|
|
|
02/19/99 301 - frame ok . engineering approved. rated corridor tunal app
|
INSP-Sprinkler Rough-in/Hydro | 2/19/1999 | 2/19/1999 | 2/19/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - partial rough in 100 sq ft spacing
|
INSP - Framing/Rough-in | 2/18/1999 | 2/18/1999 | 2/18/1999 | P | FAIL |
Russ Owen
|
|
|
02/18/99 407 - has corridor,and front open wall header corrctions also c
|
INSP-Sprinkler Rough-in/Hydro | 2/18/1999 | 2/18/1999 | 2/18/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - PARTIAL ROUGH IN USING 100 SQ FT SPACING
|
INSP - Framing/Rough-in | 2/16/1999 | 2/16/1999 | 2/16/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - #1072. ok to rock 1 side only at bulkhead
|
INSP - Conference | 2/12/1999 | 2/12/1999 | 2/12/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - #1072; re cn of 2-11-99; keep c/n
|
INSP - Framing/Rough-in | 2/11/1999 | 2/11/1999 | 2/11/1999 | P | FAIL |
Carl Dependahl
|
|
|
02/11/99 340 - 1072 ###-####; c/n seal demising wall, chk eng'g at front etc
|
INSP - Framing/Rough-in | 2/10/1999 | 2/10/1999 | 2/10/1999 | P | PART |
Carl Dependahl
|
|
|
john ###-#### partial framing; spoke w/ john, ok to cver 1 side need full elec r/i
|