BLD-Final | 6/26/2000 | 6/26/2000 | 6/26/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm 6/27/00 2:42:33 PM
|
Permanent Occupancy | | 6/26/2000 | 6/26/2000 | | DONE |
|
|
|
|
BLD-Final | 1/18/2000 | 1/19/2000 | 1/19/2000 | P | PART |
Tom Arcoraci
|
|
|
Harvey ###-#### Ok for temp. 1/20/00 9:21:08 AM
|
FIRE-Final Inspection | 1/18/2000 | 1/19/2000 | 1/19/2000 | A | PART |
Joe Tawney
|
|
|
late am ###-#### Harvey Reinsp. ok for temp. occ. FDC extension. 1/20/00 9:11:21 AM
|
BLD-Final | 1/13/2000 | 1/14/2000 | 1/14/2000 | P | FAIL |
Tom Arcoraci
|
|
|
harvey ###-#### Not ready. 1/18/00 8:59:57 AM
|
FIRE-Final Inspection | 1/13/2000 | 1/14/2000 | 1/14/2000 | A | FAIL |
Joe Tawney
|
|
|
harvey ###-#### Reinsp. final C/N reissued. 1/14/00 2:59:32 PM
|
BLD-Final | 1/5/2000 | 1/7/2000 | 1/7/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Harvey ###-####. Canc. By contractor.
|
FIRE-Final Inspection | 1/5/2000 | 1/6/2000 | 1/6/2000 | A | FAIL |
Joe Tawney
|
|
|
Harvey ###-####. Final fail C/N issued.
|
BLD-Framing/Rough-in | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | PART |
Tom Arcoraci
|
|
|
mel--- ###-#### ceiling grid insp Grid ok
|
BLD-Framing/Rough-in | 11/3/1999 | 11/3/1999 | 11/3/1999 | P | FAIL |
Wes Worcester
|
|
|
CEILING GRID SIZEMIC (? SPELLING) MEL ###-#### No one onsite @ 4pm
|
FIRE-Sprinkler Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 | P | PART |
Joe Tawney
|
|
|
CLARENCE ###-#### Ok on spklr. R/I for all piping
|
FIRE-Sprinkler Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | PART |
Joe Tawney
|
|
|
clearance ###-#### r/I Ok on spkl. R/I in of small rooms.
|
FIRE-Sprinkler Rough-in | 10/7/1999 | 10/8/1999 | 10/8/1999 | A | PART |
Joe Tawney
|
|
|
SPRK ROUGH IN OK TO COVER CEILING IN ASEMBLY AREAS
|
FIRE-Sprinkler Rough-in | 10/4/1999 | 10/7/1999 | 10/7/1999 | A | FAIL |
Joe Tawney
|
|
|
Brian ###-#### or cell phone ###-#### r/I could not locate spklr contr
|
BLD-Framing/Rough-in | 10/4/1999 | 10/5/1999 | 10/5/1999 | A | PART |
Tom Arcoraci
|
|
|
Mel ###-#### okay to cover part
|
BLD-Framing/Rough-in | 9/24/1999 | 9/24/1999 | 9/24/1999 | P | PART |
Tom Arcoraci
|
|
|
harvey ###-#### cell--fr insp See C/notice at site dated 09/24/99
|
FIRE-Sprinkler Rough-in | 9/23/1999 | 9/24/1999 | 9/24/1999 | P | PART |
Joe Tawney
|
|
|
BRIAN ###-#### PART R/I ok to cover 3 lines in assembly room
|
BLD-Framing/Rough-in | 9/21/1999 | 9/22/1999 | 9/22/1999 | A | PART |
Tom Arcoraci
|
|
|
partial framing harvey ###-#### 1hr. Wall inspection
|
INSP - Framing/Rough-in | 9/13/1999 | 9/14/1999 | 9/14/1999 | A | PART |
Tom Arcoraci
|
|
|
OK TO COVER 1 HD WALL THAT IS ALSO A SHEAR WALL -NORTH SIDE
|
INSP - Foundation | 6/21/1999 | 6/22/1999 | 6/22/1999 | A | PART |
Tom Arcoraci
|
|
|
06/22/99 408 - Mel ###-####
|
INSP - Foundation | 6/15/1999 | 6/16/1999 | 6/16/1999 | P | PART |
Tom Arcoraci
|
|
|
06/16/99 408 - Mel ###-####
|
INSP - Foundation | 6/8/1999 | 6/9/1999 | 6/9/1999 | P | PART |
Alan Hauser
|
|
|
06/09/99 350 - conference with builder, ftns. to be special inspector
|