BLD-Final | 5/12/2000 | 5/12/2000 | 5/12/2000 | P | PASS |
Bob Archibald
|
|
|
###-#### call first for access. LC issued.
|
BLD-Final | 5/9/2000 | 5/9/2000 | 5/9/2000 | P | FAIL |
Jim Sly
|
|
|
Steve ###-#### call first C/N bldg. official to ok firepole...misc. 5/11/00 11:04:19 AM
|
INSP - Energy code compliance | 2/3/1999 | 2/3/1999 | 2/3/1999 | P | PASS |
Jim Sly
|
|
|
02/03/99 316 -
|
INSP - Framing/Rough-in | 2/1/1999 | 2/2/1999 | 2/2/1999 | A | FAIL |
Jim Sly
|
|
|
02/02/99 316 - C/N...Need fireplace insp and complete frame around F/P.
|
INSP - Framing/Rough-in | 1/21/1999 | 1/22/1999 | 1/22/1999 | A | FAIL |
Carl Dependahl
|
|
|
01/22/99 340 - steve callan ###-#### shear wall insp, c/n,need install c eng'd plan. recommend eng'r to approve.
|
INSP - Foundation | 12/29/1998 | 12/29/1998 | 12/29/1998 | P | FAIL |
Jim Sly
|
|
|
12/29/98 316 - Foot width,height,soil,cont foot/bar OK...setbks?..No app
|
INSP - Foundation | 12/28/1998 | 12/29/1998 | 12/29/1998 | A | FAIL |
Jim Sly
|
|
|
12/29/98 316 - Not Ready
|
INSP - Framing/Rough-in | 1/29/1999 | 2/1/1999 | 1/19/1990 | A | PART |
Jim Sly
|
|
|
02/01/99 316 - Shear wall only....OK
|