INSP - Final | 4/9/1999 | 4/9/1999 | 4/9/1999 | | PASS |
Jim Storey
|
|
|
/ / 301 - FINAL OK NEED TO ISUE L/C
|
INSP - Final | 3/22/1999 | 3/23/1999 | 3/23/1999 | A | FAIL |
Jim Storey
|
|
|
03/23/99 301 - conf. ok n/r for final.
|
INSP - Framing/Rough-in | 2/26/1999 | 2/26/1999 | 2/26/1999 | | NR |
Jim Storey
|
|
|
02/25/99 301 - not on site recall when ready
|
INSP - Foundation | 2/11/1999 | 2/12/1999 | 2/12/1999 | A | PASS |
Jim Storey
|
|
|
02/12/99 301 - grout ok for mezaniane ledger
|
INSP - Framing/Rough-in | 2/10/1999 | 2/11/1999 | 2/11/1999 | A | PART |
Jim Storey
|
|
|
02/11/99 301 - top lift grout ok
|
INSP - Concrete | 2/8/1999 | 2/9/1999 | 2/9/1999 | A | PASS |
Jim Storey
|
|
|
02/09/99 301 - 2ND GROUT LIFT OK , DUSCUSED BOND BEAM AT LEDGER WITH ENG
|
INSP - Concrete | 2/5/1999 | 2/8/1999 | 2/8/1999 | A | PART |
Russ Owen
|
|
|
02/08/99 407 - first lift ok.
|
INSP - Framing/Rough-in | 2/4/1999 | 2/5/1999 | 2/5/1999 | P | FAIL |
Jim Storey
|
|
|
02/05/99 301 - WIP -WORK IN PROGRESS
|
INSP - Concrete | 2/1/1999 | 2/2/1999 | 2/2/1999 | A | PART |
Jim Storey
|
|
|
02/02/99 301 - rebar ok pending special insp. report.
|
INSP - Foundation | 1/29/1999 | 2/1/1999 | 2/1/1999 | A | FAIL |
Jim Storey
|
|
|
02/01/99 301 - FORMS IN PLACE NO REBAR SET SPECIAL INSP. TO BE ON SITE A
|