Permanent Occupancy | | 5/19/1999 | 5/19/1999 | | DONE |
|
|
|
|
INSP - Final | 5/14/1999 | 5/14/1999 | 5/14/1999 | P | PASS |
Tom Arcoraci
|
|
|
05/14/99 408 - OK FOR PERM WHEN OTHERS HAVE SIGNED
|
INSP - Final | 5/13/1999 | 5/13/1999 | 5/13/1999 | P | FAIL |
Tom Arcoraci
|
|
|
05/13/99 408 - not ready
|
INSP-Final Inspection | 5/13/1999 | 5/13/1999 | 5/13/1999 | P | PASS |
Joe Tawney
|
|
|
05/13/99 406 - REINSP OK FOR PERM OCC
|
INSP-Final Inspection | 5/10/1999 | 5/10/1999 | 5/10/1999 | P | FAIL |
Joe Tawney
|
|
|
05/10/99 406 - FINAL FAIL FIRE EXT , RR WRAP, MIRROR HEIGHT
|
INSP - Framing/Rough-in | 4/9/1999 | 4/9/1999 | 4/9/1999 | P | CANC |
Joe Tawney
|
|
|
04/09/99 406 - CANCEL SHOULD BE STRUCTURAL INSP
|
INSP-Conference | 4/5/1999 | 4/6/1999 | 4/6/1999 | P | PART |
Joe Tawney
|
|
|
04/06/99 406 - CONF ON FIRE AND LIFE SAFETY ITEMS FOR NEW BLDG
|
INSP - Framing/Rough-in | 3/18/1999 | 3/18/1999 | 3/18/1999 | P | PASS |
Tom Arcoraci
|
|
|
ALAN ###-####
|
INSP - Framing/Rough-in | 3/16/1999 | 3/17/1999 | 3/17/1999 | A | PART |
Tom Arcoraci
|
|
|
ALAN ###-#### ok to cover half walls if ok with other inspectors
|
INSP - Framing/Rough-in | 3/9/1999 | 3/11/1999 | 3/11/1999 | | PART |
Tom Arcoraci
|
|
|
03/11/99 408 - conference
|
INSP - Framing/Rough-in | 3/11/1999 | 3/11/1999 | 3/11/1999 | P | PART |
Tom Arcoraci
|
|
|
03/11/99 408 - ok to cover ext walls
|
INSP - Foundation | 3/5/1999 | 3/5/1999 | 3/5/1999 | P | FAIL |
Tom Arcoraci
|
|
|
03/05/99 408 - alan ###-#### found wall poured with out inspection
|
INSP - Concrete | 3/1/1999 | 3/1/1999 | 3/1/1999 | P | PART |
Tom Arcoraci
|
|
|
03/01/99 408 - FOOTING OK
|