INSP - Final | 4/27/1999 | 4/28/1999 | 4/28/1999 | P | PASS |
Jim Sly
|
|
|
04/28/99 316 - C/C # 16147
|
INSP - Energy code compliance | 2/11/1999 | 2/16/1999 | 2/17/1999 | A | PASS |
Jim Sly
|
|
|
02/16/99 316 - allen ###-####
|
INSP - Framing/Rough-in | 2/15/1999 | 2/16/1999 | 2/16/1999 | A | PASS |
Jim Sly
|
|
|
02/16/99 316 - Scheduled by Hello!. Contact phone is [8700408].
|
INSP - Framing/Rough-in | 2/12/1999 | 2/12/1999 | 2/12/1999 | | FAIL |
Jim Sly
|
|
|
02/12/99 316 - C/N...Nail bearing blocks per eng.
|
INSP - Framing/Rough-in | 2/5/1999 | 2/8/1999 | 2/8/1999 | A | PART |
Jim Sly
|
|
|
02/08/99 316 - Shear wall insp only.....OK
|
INSP - Foundation | 1/19/1999 | 1/19/1999 | 1/19/1999 | P | PART |
Jim Sly
|
|
|
01/19/99 316 - Foot width,soil,height, cont foot/rebar...OK..Setbks?..No
|