Permanent Occupancy | | 5/5/2000 | 5/5/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/18/2000 | 2/22/2000 | 2/22/2000 | A | PASS |
Rick Jackson
|
|
|
###-#### FN FIRE Occ. approved. 2/23/00 1:54:30 PM
|
FIRE-Final Inspection | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | FAIL |
Rick Jackson
|
|
|
Jamie walarmco ###-#### alarms ; ada rooms ;c/n issued.
|
BLD-Other | 1/20/2000 | 1/21/2000 | 1/21/2000 | P | PASS |
|
|
|
Scheduled by a contractor via Hello! on 01/20/2000 at 08:32:57. Contact: . plaza woork almost complete 1/24/00 8:03:31 AM
|
BLD-Conference | 1/20/2000 | 1/20/2000 | 1/20/2000 | P | PASS |
|
|
|
Scheduled by a contractor via Hello! on 01/20/2000 at 08:32:35. Contact: . ceiling made ok spreader bars in lace 1/21/00 6:41:30 AM
|
BLD-Other | 1/6/2000 | 1/6/2000 | 1/6/2000 | A | PART |
|
|
|
ceiling grid and exiting
|
BLD-Wall cover | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 10:51:04. Contact: .
|
BLD-Conference | 11/2/1999 | 11/2/1999 | 11/2/1999 | A | PART |
|
|
|
Ok to cover walls/ all
|
BLD-Wall cover | 10/28/1999 | 10/28/1999 | 10/28/1999 | A | PART |
|
|
|
Pre frame walk through interior or 4hr wall
|
BLD-Wall cover | 10/12/1999 | 10/22/1999 | 10/22/1999 | A | PART |
|
|
|
Ok on top layer of 4-hour wall- needs 2 coats tape and mud.
|
BLD-Wall cover | 10/12/1999 | 10/20/1999 | 10/20/1999 | P | PART |
|
|
|
Dryer vent termination problems/4 hr wall start on 3rd/4th layers.
|
BLD-Wall cover | 10/19/1999 | 10/19/1999 | 10/19/1999 | P | PART |
|
|
|
3rd layer 4hr wall.
|
BLD-Wall cover | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | PART |
|
|
|
Made ok for 2 layer 4hr wall drywall attachment.
|
BLD-Wall cover | 10/12/1999 | 10/15/1999 | 10/15/1999 | A | PART |
|
|
|
4hr wall cover
|
BLD-Wall cover | 10/12/1999 | 10/13/1999 | 10/13/1999 | P | PART |
|
|
|
Conf. On 4hr. Wall drywall.
|
BLD-Wall cover | 10/11/1999 | 10/11/1999 | 10/11/1999 | P | PART |
|
|
|
elel rough signed off, confer with drywaller on the 4-hour wall attachment schedule
|
BLD-Wall cover | 9/30/1999 | 10/8/1999 | 10/8/1999 | A | PART |
|
|
|
club house discuss accessability
|
BLD-Wall cover | 9/30/1999 | 10/6/1999 | 10/6/1999 | P | PART |
|
|
|
clubhouse t.i. Reject door hardware changes submitted by mark sanders- see file
|
BLD-Wall cover | 9/30/1999 | 10/4/1999 | 10/4/1999 | A | PART |
|
|
|
clubhouse.. Discussion on cover schedule, ducting and for routing of fire place "B" venting
|
BLD-Wall cover | 9/21/1999 | 10/1/1999 | 10/1/1999 | A | PART |
|
|
|
2 hour wall connection conf -- Perry Paine
|
BLD-Wall cover | 9/21/1999 | 9/29/1999 | 9/29/1999 | P | PART |
|
|
|
Hold downs, ceiling membrane penetrations joist cutting and repair
|
BLD-Wall cover | 9/21/1999 | 9/27/1999 | 9/27/1999 | A | PART |
|
|
|
94 UBC 601.5.2.2 hold downs/ shear nailing or 1st floor
|
BLD-Wall cover | 9/21/1999 | 9/24/1999 | 9/24/1999 | A | PART |
|
|
|
94 UBC 601.5.2.2
|
BLD-Wall cover | 9/21/1999 | 9/22/1999 | 9/22/1999 | P | PART |
|
|
|
ext shear ok
|
BLD-Conference | 9/21/1999 | 9/20/1999 | 9/20/1999 | A | PART |
|
|
|
|