INSP - Final | 4/22/1999 | 4/23/1999 | 4/23/1999 | P | PASS |
Jim Sly
|
|
|
04/23/99 316 - C/C # 16141
|
INSP - Final | 4/21/1999 | 4/22/1999 | 4/22/1999 | P | FAIL |
Jim Sly
|
|
|
04/22/99 316 - C/N....Need plumb final.......
|
INSP - Framing/Rough-in | 3/24/1999 | 3/25/1999 | 3/25/1999 | A | PASS |
Jim Sly
|
|
|
03/25/99 316 - Drywall shear nailing OK
|
INSP - Energy code compliance | 3/15/1999 | 3/15/1999 | 3/15/1999 | P | PASS |
Jim Sly
|
|
|
03/15/99 316 -
|
INSP - Framing/Rough-in | 3/11/1999 | 3/12/1999 | 3/12/1999 | A | FAIL |
Jim Sly
|
|
|
03/12/99 316 - C/N...Lat bracing
|
INSP - Framing/Rough-in | 3/3/1999 | 3/4/1999 | 3/4/1999 | A | PART |
Jim Sly
|
|
|
03/04/99 316 - Shear wall only....OK
|
INSP - Foundation | 2/2/1999 | 2/3/1999 | 2/3/1999 | P | FAIL |
Jim Sly
|
|
|
02/03/99 316 - NR..for footing insp...No forms or humans on site. Left
|