INSP - Final | 5/17/1999 | 5/18/1999 | 5/18/1999 | A | PASS |
Jim Sly
|
|
|
05/18/99 316 - C/C # 16160
|
INSP - Final | 5/17/1999 | 5/17/1999 | 5/17/1999 | P | FAIL |
Jim Sly
|
|
|
05/17/99 316 - No instructions for access....left note
|
INSP - Final | 5/14/1999 | 5/14/1999 | 5/14/1999 | P | FAIL |
Jim Sly
|
|
|
05/14/99 316 - Pay 42.00 reinsp fee prior to calling for final....Wrote
|
INSP - Final | 5/12/1999 | 5/13/1999 | 5/13/1999 | A | FAIL |
Tom Arcoraci
|
|
|
05/13/99 408 - Scheduled by Hello!.
|
INSP - Final | 5/10/1999 | 5/10/1999 | 5/10/1999 | | PASS |
Joe Tawney
|
|
|
/ / 406 - FINAL SPKLR SYSTEM & ALARMS OK
|
INSP - Final | 5/10/1999 | 5/10/1999 | 5/10/1999 | P | FAIL |
Jim Sly
|
|
|
05/10/99 316 - C/N...Need Mech final, wrap boots, seal penitr gar, int a
|
INSP - Energy code compliance | 3/15/1999 | 3/15/1999 | 3/15/1999 | P | PASS |
Jim Sly
|
|
|
03/15/99 316 -
|
INSP-Sprinkler Rough-in/Hydro | 3/15/1999 | 3/15/1999 | 3/15/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON INSUL TENTING OF SPKLR PIPING
|
INSP - Framing/Rough-in | 3/10/1999 | 3/11/1999 | 3/11/1999 | A | PASS |
Jim Sly
|
|
|
03/11/99 316 - Engineer letter approving shear and HDs as installed.
|
INSP - Framing/Rough-in | 3/9/1999 | 3/9/1999 | 3/9/1999 | P | FAIL |
Tom Arcoraci
|
|
|
03/09/99 408 - Scheduled by Hello!. needs fire sprinkler rough in
|
INSP - Framing/Rough-in | 3/1/1999 | 3/1/1999 | 3/1/1999 | P | PART |
Jim Sly
|
|
|
03/01/99 316 - Shear wall only....OK
|
INSP - Foundation | 2/1/1999 | 2/1/1999 | 2/1/1999 | P | PART |
Jim Sly
|
|
|
02/01/99 316 - Foot width,height,soil, cont.foot/bar...OK setbks? Early.
|