INSP - Final | 4/28/1999 | 4/29/1999 | 4/29/1999 | A | PASS |
Tom Arcoraci
|
|
|
04/29/99 408 - reinspect/ Kent ###-####
|
INSP - Final | 4/27/1999 | 4/28/1999 | 4/28/1999 | A | FAIL |
Tom Arcoraci
|
|
|
04/28/99 408 - Kent ###-####
|
INSP - Energy code compliance | 3/17/1999 | 3/17/1999 | 3/17/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 3/15/1999 | 3/16/1999 | 3/16/1999 | A | PASS |
Jim Sly
|
|
|
03/16/99 316 -
|
INSP - Framing/Rough-in | 3/12/1999 | 3/12/1999 | 3/12/1999 | P | FAIL |
Tom Arcoraci
|
|
|
03/12/99 408 - ok to insulate
|
INSP - Framing/Rough-in | 3/4/1999 | 3/4/1999 | 3/4/1999 | P | PART |
Jim Sly
|
|
|
03/04/99 316 - Shear wall only....OK
|
INSP - Foundation | 2/8/1999 | 2/8/1999 | 2/8/1999 | P | PART |
Jim Sly
|
|
|
02/08/99 316 - Early start ..soil,height,cont.foot/bar,foot width,OK..Se
|