FIRE-Sprinkler Rough-in | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 17:00:53. Contact: ###-####. Should have been called in as 00 not 99 5/12/00 2:07:31 PM
|
FIRE-Supply Line Hydro | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 17:00:22. Contact: ###-####. Should have been called in as 00 not 99 5/12/00 2:07:19 PM
|
INSP - Final | 7/9/1999 | 7/9/1999 | 7/9/1999 | P | PASS |
Jim Sly
|
|
|
07/09/99 316 - C/C # 16192
|
INSP - Energy code compliance | 3/26/1999 | 3/30/1999 | 3/30/1999 | A | PASS |
Russ Owen
|
|
|
03/30/99 407 - Scheduled by Hello!.
|
INSP - Framing/Rough-in | 3/26/1999 | 3/29/1999 | 3/29/1999 | A | FAIL |
Jim Sly
|
|
|
03/29/99 316 - C/N...Fireblk
|
INSP - Framing/Rough-in | 3/18/1999 | 3/19/1999 | 3/19/1999 | A | PART |
Jim Sly
|
|
|
03/19/99 316 - Shear wall only....OK
|
INSP - Foundation | 2/23/1999 | 2/24/1999 | 2/24/1999 | A | PART |
Jim Sly
|
|
|
02/24/99 316 - Foot/bar, foot width,height, appears OK...Soil and setbks
|
INSP - Framing/Rough-in | 2/24/1999 | 2/24/1999 | 2/24/1999 | P | FAIL |
Jim Sly
|
|
|
02/24/99 316 - NR
|
INSP - Foundation | 2/22/1999 | 2/23/1999 | 2/23/1999 | A | FAIL |
Jim Sly
|
|
|
02/23/99 316 - Raining hard.....NR
|