Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-00380
StatusFinaled
Name PRICE FINANCING PTNRSHIP L P
Site Address 350 N MILWAUKEE ST Unit: 1041
Project NameBTS - #1041
Customer Number 
ePlanReviewNo
Description
To remodel an existing 3,504 sq.ft. retail tenant per approved plans on file. Work to include, demolition of interior nonbearing partitions, construction of a new storefront system, instalation of a new roll up security grill, installation of a new suspended ceiling system, construction of a new noncmbustible partition to divde stockroom from sales area, construction of new fitting rooms one to be fully accessible, remodel an existing restroom. Miscelaneous interior finishes. NOTE: This building is fully fire sprinklered and has a smoke control system. Any alterations or modification to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. Smoke evacuation system is to be maintained and connected to the original system installed under the 1985 UBC (P.C.#112-99) *RMH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 7/13/20007/13/2000 DONE
Details
Permanent Occupancy 7/13/20007/13/2000 DONE
Details
BLD-Final7/12/20007/12/20007/13/2000PPASS
DetailsCarl Dependahl
Braun's (clothing store) - the one we talked about OK for C/N 7/13/00 1:35:24 PM
FIRE-Final Inspection7/12/20007/12/20007/12/2000PPASS
DetailsJoe Tawney
Braun's (clothing store) - please let Cathy know when you approve this Reinsp. ok for perm. occ. 7/13/00 11:31:17 AM
BLD-Final12/6/199912/6/199912/6/1999PFAIL
DetailsCarl Dependahl
Temporary occ. given 5/25/99 needs a final by you and fire. Inspection request sent to fire and card is in your box. Keep C/N.. Has fire C/N.
FIRE-Final Inspection12/6/199912/6/199912/6/1999PFAIL
DetailsJoe Tawney
Temp. occ given 5/24/99 needs final from struct. and fire. Card is here in office. Reinsp. Fail front siding door hardware.
INSP - Final6/21/19996/21/19996/21/1999 FAIL
DetailsCarl Dependahl
/ / 340 - CONF W/ MALL; KEEP C/N
INSP - Final5/24/19995/25/19995/25/1999PFAIL
DetailsCarl Dependahl
05/25/99 340 - Ryan ###-####; C/N RE PENETRATIONS OF CORRIDOR, REFERRED
INSP - Final5/21/19995/24/19995/24/1999PFAIL
Details
05/24/99 338 - plm and fire corections
INSP-Final Inspection5/21/19995/24/19995/24/1999APART
DetailsJoe Tawney
05/23/99 406 - REINSP OK FOR TEMP OCC DOOR HDWRE, SEAL PENETRATION
INSP - Final5/20/19995/21/19995/21/1999P
DetailsCarl Dependahl
Ryan ###-####
INSP-Final Inspection5/20/19995/21/19995/21/1999AFAIL
DetailsJoe Tawney
05/21/99 406 - FINAL FAIL ALARM TEST, DOOR HDWRE, PENETRATION SEAL
INSP - Framing/Rough-in5/17/19995/18/19995/18/1999APART
DetailsCarl Dependahl
05/18/99 340 - ceiling grid Ryan ###-#### grid ok; keep c/n for hvac pen
INSP-Sprinkler Rough-in/Hydro4/22/19994/22/19994/22/1999 PART
DetailsJoe Tawney
/ / 406 - OKON PARTIAL ROUGH IN OF SPKLRS
INSP - Framing/Rough-in4/20/19994/21/19994/22/1999APART
DetailsCarl Dependahl
04/21/99 340 - inspection for welding/ryan ###-#### unit 1041; KEEP C/N,
INSP - Framing/Rough-in4/21/19994/22/19994/21/1999APART
DetailsCarl Dependahl
04/22/99 340 - ###-#### RYAN//FRAMING; steel plates at front ok, keep c/
INSP - Framing/Rough-in4/15/19994/15/19994/15/1999PFAIL
DetailsCarl Dependahl
04/15/99 340 - ###-#### brian; C/N, NEED ACCURATE HVAC PLAN, DAMPERS AT