BLD-Final | 5/9/2000 | 5/10/2000 | 5/10/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 17:44:25. Contact: ###-####. no answer contact # no code for gate 5/10/00 10:05:49 AM madeok 2nd trip c/c issued # 19359 5/10/00 10:51:21 AM
|
BLD-Wall cover | 12/21/1999 | 12/21/1999 | 12/21/1999 | P | PASS |
Russ Owen
|
|
|
Shear wall - Gordon, ###-#### Interior shear walls.
|
BLD-Framing/Rough-in | 11/4/1999 | 11/5/1999 | 11/5/1999 | A | PART |
Russ Owen
|
|
|
SHEAR WALL -RE-INSP -- GORDON ###-#### Ok to pour garage and those, posted corrections remain on window.
|
BLD-Energy code compliance | 11/2/1999 | 11/3/1999 | 11/3/1999 | A | PART |
Russ Owen
|
|
|
###-#### can you give him 1/2 notice Truss block, vappor barrier exposed, gas fire place not approved.
|
BLD-Framing/Rough-in | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PART |
Jim Storey
|
|
|
GARY ###-#### C/N ok to insulate
|
BLD-Framing/Rough-in | 9/24/1999 | 9/24/1999 | 9/24/1999 | P | PASS |
Russ Owen
|
|
|
sheer wall/nailin ###-#### Jerry Beck Ok to side
|
BLD-Framing/Rough-in | 9/20/1999 | 9/20/1999 | 9/20/1999 | P | FAIL |
Russ Owen
|
|
|
shear wall inspection gary ###-#### Left corrections
|
INSP - Foundation | 3/3/1999 | 3/4/1999 | 3/4/1999 | A | PART |
Russ Owen
|
|
|
FOUNDATION WALLS 2 HORIZONTAL BARS, EARLY START NO APPROVED PLANS AT THE SITE,WORK APPEARS OK,BUT SOME CHANGES APPEAR TO HAVE BEEN MADE.
|
INSP - Foundation | 3/1/1999 | 3/1/1999 | 3/1/1999 | P | PART |
Russ Owen
|
|
|
03/01/99 407 - early start no plans at site.
|