BLD-Final | 11/29/1999 | 11/30/1999 | 11/30/1999 | P | PASS |
|
|
|
rich ###-#### Signed perm. Col.
|
FIRE-Final Inspection | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | PASS |
Rick Jackson
|
|
|
rich ###-####
|
Permanent Occupancy | | 11/30/1999 | 11/30/1999 | | DONE |
|
|
|
|
INSP-Final Inspection | 7/29/1999 | 7/30/1999 | 7/30/1999 | A | FAIL |
Rick Jackson
|
|
|
RICH ###-#### extinguisher; door at corridor
|
INSP-Final Inspection | 7/30/1999 | 7/30/1999 | 7/30/1999 | P | PASS |
Rick Jackson
|
|
|
Rich ###-#### occ approved
|
INSP - Final | 7/23/1999 | 7/23/1999 | 7/23/1999 | P | |
|
|
|
Rich ###-####
|
INSP - Framing/Rough-in | 6/10/1999 | 6/10/1999 | 6/19/1999 | P | FAIL |
Jim Storey
|
|
|
06/10/99 301 - nr
|
INSP - Framing/Rough-in | 6/10/1999 | 6/11/1999 | 6/11/1999 | A | FAIL |
Wes Worcester
|
|
|
06/11/99 342 - ###-####//CEILING GRID given to J Storey
|
INSP - Framing/Rough-in | 4/29/1999 | 4/29/1999 | 4/29/1999 | P | |
|
|
|
structural/ Rich ###-####
|
INSP - Framing/Rough-in | 4/27/1999 | 4/28/1999 | 4/28/1999 | P | PART |
|
|
|
04/28/99 338 - lead application made ok
|
INSP-Conference | 4/28/1999 | 4/28/1999 | 4/28/1999 | A | PART |
Rick Jackson
|
|
|
walk through and review of plans with contractor and Perry
|
INSP - Framing/Rough-in | 4/26/1999 | 4/27/1999 | 4/27/1999 | P | CANC |
|
|
|
x-ray framing/ Rich ###-#### CONTRACTOR CANCELLED NOT READY
|
INSP - Framing/Rough-in | 4/15/1999 | 4/16/1999 | 4/15/1999 | P | PART |
|
|
|
made ok to cover with approved plans and plmg inspection completed all to match existing work in place
|
INSP - Energy code compliance | 3/22/1999 | 3/23/1999 | 3/23/1999 | A | PART |
|
|
|
made ok for cover 1- side
|
INSP - Energy code compliance | 3/23/1999 | 3/23/1999 | 3/23/1999 | | PART |
|
|
|
03/23/99 338 - need to have fire block at all top plate penetrations of
|
INSP - Energy code compliance | 3/22/1999 | 3/22/1999 | 3/22/1999 | | PASS |
|
|
|
03/22/99 338 - made ok ot cover 1- side of framed walls
|