FIRE-Final Inspection | 12/17/1999 | 12/20/1999 | 12/20/1999 | A | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 12/17/1999 at 15:39:46. Contact: ###-####. L/C issued.
|
INSP - Energy code compliance | 6/10/1999 | 6/10/1999 | 6/10/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 6/8/1999 | 6/9/1999 | 6/9/1999 | A | PASS |
Jim Sly
|
|
|
06/09/99 316 -
|
INSP - Framing/Rough-in | 6/7/1999 | 6/7/1999 | 6/7/1999 | P | PASS |
Jim Sly
|
|
|
06/07/99 316 -
|
INSP - Framing/Rough-in | 5/19/1999 | 5/21/1999 | 5/21/1999 | A | PASS |
Jim Sly
|
|
|
05/21/99 316 - Shear wall OK
|
INSP - Foundation | 5/14/1999 | 5/14/1999 | 5/14/1999 | P | PART |
Jim Sly
|
|
|
05/14/99 316 - Found wall and rebar OK...No appr plans to verify setbks
|
INSP - Concrete | 5/10/1999 | 5/10/1999 | 5/10/1999 | P | PART |
Jim Sly
|
|
|
05/10/99 316 - Foot width, soil and (2) #4 bar at Gar foot...Setbks? No
|