BLD-Final | 2/4/2000 | 2/7/2000 | 2/7/2000 | P | PASS |
|
|
|
Sid ###-#### made ok for final all signoffs complete; signed the occ req card for perm 2/8/00 8:28:34 AM
|
FIRE-Final Inspection | 2/4/2000 | 2/7/2000 | 2/7/2000 | A | 409 |
Rick Jackson
|
|
|
syde ###-####
|
Permanent Occupancy | | 2/7/2000 | 2/7/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/27/1999 | 12/27/1999 | 12/27/1999 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 10:54:15. Contact: ###-####. Door closures on rated doors; Rated opening protection needed for elevator control valve.
|
BLD-Framing/Rough-in | 11/8/1999 | 11/8/1999 | 11/17/1999 | P | FAIL |
Wes Worcester
|
|
|
MEZAINE LEVEL ONLY-2ND FLOOR---SID -###-#### FR Given to Perry #338.
|
BLD-Framing/Rough-in | 11/10/1999 | 11/10/1999 | 11/10/1999 | P | PASS |
|
|
|
SID-- ###-#### FR INSP Ok to cover.
|
BLD-Framing/Rough-in | 11/8/1999 | 11/8/1999 | 11/8/1999 | P | PART |
Wes Worcester
|
|
|
Ok to cover upper level wall.
|
BLD-Framing/Rough-in | 10/6/1999 | 10/7/1999 | 10/7/1999 | A | PART |
|
|
|
Sid ###-#### ok to cover I-side deminsing wall and north wall.
|
INSP - Framing/Rough-in | 9/2/1999 | 9/3/1999 | 9/3/1999 | A | FAIL |
|
|
|
met with framers need more info on the eng for the header columns
|