BLD-Final | 2/22/2000 | 2/22/2000 | 2/22/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/22/2000 at 09:21:03. Contact: . C/C #17267. 2/23/00 1:46:22 PM
|
BLD-Final | 2/18/2000 | 2/18/2000 | 2/18/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/18/2000 at 07:57:24. Contact: . Left C/N. 2/22/00 9:59:41 AM
|
INSP - Framing/Rough-in | 8/13/1999 | 8/13/1999 | 8/13/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Energy code compliance | 8/12/1999 | 8/12/1999 | 8/12/1999 | P | PASS |
Jim Sly
|
|
|
08/12/99 316 -
|
INSP - Framing/Rough-in | 8/11/1999 | 8/11/1999 | 8/11/1999 | P | FAIL |
Jim Sly
|
|
|
08/11/99 316 - C/N.....Complete prev corr
|
INSP - Framing/Rough-in | 8/10/1999 | 8/10/1999 | 8/10/1999 | P | FAIL |
Tom Arcoraci
|
|
|
08/10/99 408 - SCOTT ###-####
|
INSP - Framing/Rough-in | 7/21/1999 | 7/21/1999 | 7/21/1999 | P | PART |
Jim Sly
|
|
|
07/21/99 316 - C/N...Shear OK except south panel gar front
|
INSP - Foundation | 6/9/1999 | 6/9/1999 | 6/9/1999 | P | PART |
Jim Sly
|
|
|
06/09/99 316 - Foot, rebar, and soil OK.....Setbks?....No appr plans...E
|