Permanent Occupancy | | 5/9/2000 | 5/9/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/3/2000 | 4/4/2000 | 4/4/2000 | A | PASS |
Rick Jackson
|
|
|
occupancy approved
|
BLD-Final | 3/23/2000 | 3/24/2000 | 3/24/2000 | P | PART |
|
|
|
rod ###-#### signed the temp cpl 03/27/2000 6:47:44 AM
|
FIRE-Final Inspection | 3/22/2000 | 3/23/2000 | 3/23/2000 | P | PART |
Rick Jackson
|
|
|
###-#### Rod Need assembly permit 3/24/00 1:08:35 PM
|
FIRE-Conference | 3/17/2000 | 3/21/2000 | 3/21/2000 | A | FAIL |
Rick Jackson
|
|
|
8:30am rod ###-#### C/N issued. 3/23/00 8:55:23 AM
|
BLD-Framing/Rough-in | 3/15/2000 | 3/16/2000 | 3/16/2000 | P | PART |
|
|
|
###-#### ok to close the duct shafts in. 03/17/2000 9:11:20 AM
|
FIRE-Conference | 3/13/2000 | 3/16/2000 | 3/16/2000 | P | PART |
Rick Jackson
|
|
|
rod ###-#### cell--conf Sprinkler issued. 3/17/00 10:39:29 AM
|
BLD-Conference | 3/1/2000 | 3/2/2000 | 3/2/2000 | A | PART |
|
|
|
###-#### Rod ok on the 3-sides of the grease duct shafts 3/2/00 3:45:11 PM
|
BLD-Framing/Rough-in | 2/8/2000 | 2/9/2000 | 2/9/2000 | A | PART |
|
|
|
###-#### Rod ok to cover 2/10/00 10:23:12 AM
|
BLD-Framing/Rough-in | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | PART |
Jim Storey
|
|
|
###-#### c\n ok for cover n some areas noted on c\n 2/1/00 9:06:55 AM
|
BLD-Footing | 11/8/1999 | 11/8/1999 | 11/8/1999 | | PART |
|
|
|
Rod ###-#### they will pour at about 3:30 Ok to pour brale fram
|
BLD-Footing | 11/2/1999 | 11/3/1999 | 11/3/1999 | P | PART |
|
|
|
rod ###-#### ft -- Done w/sp. Insp. Approvals
|
BLD-Conference | 11/1/1999 | 11/1/1999 | 11/1/1999 | A | PASS |
|
|
|
with super on schedule of near future inspections.
|