Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01330
StatusFinaled
Name MICRON TECH
Site Address 8000 S FEDERAL WAY
Project NameMIC #2 (TA 1)
Customer NumberPCS 2508
ePlanReviewNo
Description
MICRON BUILDING #2(TA-1), DEMOLITION & SEISMIC UPGRADE (PHASE I)-(PROJECT #02-992508) TO SAWCUT AND REMOVE EXISTING FIRST FLOOR CONCRETE FLOOR SLABS, TRENCHES, FOOTING AND STRUCTURAL COLUMNS BETWEEN GRID LINES 7.5&9 AND A&D AT THE NORTH END OF BUILDING #2. TO REMOVE THE SECOND FLOOR FRAMING AND DECK BETWEEN GRID LINES 6&7 AND A&B AND BETWEEN GRID LINES 7.5&9 AND B&D, AND TO REMOVE DOUBLE-TEE FRAMING, CONCRETE TOPPING AND CMU WALLS BETWEEN GRID LINES 8&9 AND B&C. TO REMOVE THE ROOF JOIST AND DECKING BETWEEN GRID LINES 7.5&9 AND B&C. TO INSTALL NEW CONCRETE FOOTINGS, GRADE BEAMS, CONCRETE SLABS, STRUCTURAL FRAME, FLOOR AND ROOF DECKS AT THE ABOVE MENTIONED AREAS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED STRUCTURAL ENGINEER'S COMMENT LIST. THIS PERMIT IS FOR DEMOLITION AND STRUCTURAL SEISMIC UPGRADE WORK ONLY. A SEPARATE TENANT IMPROVEMENT PERMIT WILL BE REQUIRED TO FINISH THIS AREA FOR OCCUPANCY. NOTE: NO PORTION OF THIS BUILDING MAY BE OCCUPIED DURING THE DEMOLITION AND CONSTRUCTION IN PHASE I UNLESS ALL EMERGENCY NOTIFICATION, FIRE SUPPRESSION, REQUIRED EXITING AND STRUCTURAL STABILITY REQUIREMENTS ARE CONTINUOUSLY MAINTAINED FOR ALL OCCUPIED SPACES. PC#346-99/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/19/20001/20/20001/20/2000APASS
DetailsJim Storey
###-#### Ok for L/C. 1/20/00 4:15:54 PM
FIRE-Final Inspection1/12/20001/13/20001/13/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/12/2000 at 15:46:20. Contact: ###-####.
INSP - Framing/Rough-in8/11/19998/12/19998/12/1999APART
DetailsJim Storey
08/12/99 301 - joe ###-####
INSP - Framing/Rough-in7/29/19997/30/19997/30/1999APART
DetailsJim Storey
07/30/99 301 - pending engineers report