BLD-Final | 5/1/2000 | 5/2/2000 | 5/2/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-####. ok for perm.
|
Permanent Occupancy | | 5/2/2000 | 5/2/2000 | | DONE |
|
|
|
|
BLD-Final | 1/31/2000 | 2/1/2000 | 2/1/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 08:10:00. Contact: ###-####. g\n temp glass firestops etc ok to t\o 2/3/00 7:29:15 AM
|
FIRE-Final Inspection | 1/28/2000 | 2/1/2000 | 2/1/2000 | A | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 01/28/2000 at 10:53:50. Contact: ###-####. this is for a temp occ or a final if they pass
|
FIRE-Final Inspection | 1/28/2000 | 1/31/2000 | 1/31/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### alarms not working 1/31/00 1:02:14 PM
|
FIRE-Final Inspection | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Framing/Rough-in | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | FAIL |
Carl Dependahl
|
|
|
C/N- handrails, etc.
|
BLD-Framing/Rough-in | 1/19/2000 | 1/19/2000 | 1/19/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 01/19/2000 at 07:24:50. Contact: ###-####. C/N ISSUED BY 340 1/20/00 11:57:03 AM
|
BLD-Framing/Rough-in | 1/19/2000 | 1/19/2000 | 1/19/2000 | P | FAIL |
Carl Dependahl
|
|
|
C/N- shaft, handrail, etc.- ok to place ceiling tiles.
|
FIRE-Hydro test above ground | 1/14/2000 | 1/18/2000 | 1/18/2000 | A | PART |
Joe Tawney
|
|
|
russ ###-#### pager underground and above ground Ok above & underground hydro static tests. 1/18/00 1:17:47 PM
|
FIRE-Final Inspection | 1/11/2000 | 1/12/2000 | 1/12/2000 | A | PART |
Joe Tawney
|
|
|
###-#### Russ. Partial sprinkler R/I. Heads & spacing in 2nd floor vestibule.
|
BLD-Framing/Rough-in | 1/10/2000 | 1/11/2000 | 1/11/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/10/2000 at 22:21:20. Contact: ###-####. Keep C/N; ok to cover vault areas & ext. walls.
|
BLD-Wall cover | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/10/2000 at 08:21:03. Contact: ###-####. Keep C/N.
|
BLD-Framing/Rough-in | 1/5/2000 | 1/5/2000 | 1/5/2000 | P | FAIL |
Carl Dependahl
|
|
|
ceiling inspection Pat ###-####. Add seismic bracing @ grid; complete shaft etc. WIP.
|
BLD-Framing/Rough-in | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 08:41:49. Contact: ###-####. 2nd floor ext. walls ok; need eng's letter for change @ deck.
|
BLD-Framing/Rough-in | 11/30/1999 | 12/1/1999 | 12/1/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/30/1999 at 17:14:07. Contact: ###-####. Bsmt. & 1st fl. Ext.
|
BLD-Framing/Rough-in | 11/30/1999 | 11/30/1999 | 11/30/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/30/1999 at 11:26:46. Contact: ###-####. Keep C/N re: shear walls; int. walls @ bsmt. Ok.
|
FIRE-Sprinkler Rough-in | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | PART |
Joe Tawney
|
|
|
DOUG ###-#### Ok on supply line flush and R/I.
|
BLD-Framing/Rough-in | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/29/1999 at 08:48:10. Contact: ###-####. Wall @ stair @ east side ok for 1hr.; complete firestops @ deck.
|
BLD-Framing/Rough-in | 11/22/1999 | 11/23/1999 | 11/23/1999 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 16:29:45. Contact: ###-####. Re-fasten int. side shear walls per. Sched. Recall- int. part's ok met w/Arch.
|
BLD-Framing/Rough-in | 11/20/1999 | 11/22/1999 | 11/22/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/20/1999 at 16:29:21. Contact: ###-####. WIP, ok to continue, keep C/N RE: holddowns.
|
BLD-Conference | 11/19/1999 | 11/19/1999 | 11/19/1999 | P | PASS |
Carl Dependahl
|
|
|
W/supt. re: small fire, framing ok, not damaged; ok to continue.
|
BLD-Framing/Rough-in | 11/16/1999 | 11/17/1999 | 11/17/1999 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/16/1999 at 07:31:12. Contact: ###-####. Keep C/N; need firestop 1hr floor assy.
|
BLD-Framing/Rough-in | 11/12/1999 | 11/15/1999 | 11/15/1999 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/12/1999 at 13:24:36. Contact: ###-####. Keep C/N; awaiting eng's letter also checked wood & steel framing after roof fire- ok to continue.
|
BLD-Framing/Rough-in | 11/11/1999 | 11/12/1999 | 11/15/1999 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/11/1999 at 12:17:42. Contact: ###-####. Work not complete.
|
BLD-Framing/Rough-in | 11/5/1999 | 11/8/1999 | 11/8/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/05/1999 at 11:19:18. Contact: ###-####. Bsmt. Walls: keep C/N.
|
BLD-Framing/Rough-in | 11/2/1999 | 11/3/1999 | 11/4/1999 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 11/02/1999 at 17:48:20. Contact: ###-####. C/N issued.
|
BLD-Framing/Rough-in | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/25/1999 at 12:20:55. Contact: ###-####. C/N; straps, blocking, HD's etc
|
BLD-Framing/Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/21/1999 at 12:33:22. Contact: ###-####. Keep C/N- 1st fl. Ext. walls ok per. Eng.
|
BLD-Framing/Rough-in | 10/15/1999 | 10/15/1999 | 10/15/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/15/1999 at 09:33:16. Contact: ###-####. 1st fl. Ext. shear fastening
|
BLD-Framing/Rough-in | 10/8/1999 | 10/11/1999 | 10/11/1999 | P | FAIL |
Carl Dependahl
|
|
|
pat ###-#### C/N: Fastener spacing; need eng's clarification for shear wall construction.
|
FIRE-Sprinkler Rough-in | 9/24/1999 | 9/24/1999 | 9/24/1999 | P | PART |
Joe Tawney
|
|
|
ERIC-- ###-#### R/I-FIRE SPR FOR UNDER GROUND Ok to cover underground supply line
|
INSP - Foundation | 9/1/1999 | 9/2/1999 | 9/2/1999 | A | PART |
Tom Arcoraci
|
|
|
09/02/99 408 - spec inspec
|
INSP - Foundation | 8/27/1999 | 8/27/1999 | 8/27/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - WIP; EISI LOG ONSITE; NEED CLARIFY REQD 2ND EXIT AT BSMT
|
INSP - Foundation | 8/16/1999 | 8/17/1999 | 8/16/1999 | A | PART |
Carl Dependahl
|
|
|
08/17/99 340 - pre-con w/ Pat C [8677613].may need resubmittal for 2 exi
|
INSP - Foundation | 8/13/1999 | 8/16/1999 | 8/16/1999 | A | PART |
Carl Dependahl
|
|
|
08/16/99 340 - Pat ###-####; part ftgs, pend. spec insp (EISI)
|