Permit Information
Permit NumberBLD99-01468
StatusFinaled
Name WELLS FARGO
Site Address 1400 S VISTA AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel an existing bank service center office space on the ground level main floor only (7,850 sq. ft. main floor), for the same tenant, in an existing building with two stories and a basement, per approved plans on file. Also constructing two new accessible restrooms. Work to include demolishing some interior walls and doors, construction of some new interior walls, construction of a one hour fire rated corridor, new interior rated and non-rated doors, interior finish, suspended ceiling work, some mechanical, plumbing, and electrical work. The scope of this work on this permit covers the B Occupancy on the ground level main floor only. An existing A-3 is located in the basement. NOTE: This building is partially fire sprinklered in the basement. (P.C.#382-99) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/20/20001/24/20001/24/2000APASS
DetailsRuss Owen
jason-- cell ###-#### fn
FIRE-Final Inspection1/20/20001/24/20001/24/2000APASS
DetailsRick Jackson
jason- cell ###-#### fire fn
BLD-Final9/27/19999/27/19999/27/1999PPART
DetailsJim Storey
JAS LATE PM ###-#### Temp ok C/N for ADA hardware and mirror
FIRE-Final Inspection9/27/19999/27/19999/27/1999PPART
DetailsRick Jackson
JASON ###-#### Awaiting door in rated corridor- East side
BLD-Final9/23/19999/24/19999/27/1999PNR
DetailsJim Storey
JASON ###-#### Pending fire sign off
FIRE-Final Inspection9/23/19999/24/19999/24/1999APART
DetailsJoe Tawney
JASON ###-#### Awaiting rated door in corridor
BLD-Final9/22/19999/23/19999/23/1999AFAIL
DetailsJim Storey
JASON-- ###-#### TEMP OCC No fire sign off, no insp. Performed
BLD-Final9/22/19999/22/19999/22/1999PFAIL
DetailsJim Storey
jason temp occ ###-#### Need fire approval
FIRE-Final Inspection9/22/19999/22/19999/22/1999PFAIL
DetailsRick Jackson
temp final jason ###-#### Need "push to exit" signs above door release buttons
INSP-Other9/15/19999/20/19999/20/1999AFAIL
DetailsJim Storey
Pending egress release
INSP - Framing/Rough-in9/7/19999/8/19999/8/1999 PASS
DetailsJim Storey
9/8 Occupancy allowed. jrb
Sprinkler Rough-in9/7/19999/8/19999/8/1999AFAIL
DetailsRick Jackson
###-#### jason for conf for walk through; 9/8 Not sprinklered, reviewed requirements for final occupancy with general contractor, requested alarm plans. jrb
INSP - Framing/Rough-in9/7/19999/7/19999/7/1999PPASS
DetailsJim Storey
jason-- ###-#### cell -ceiling insp; Ceiling grid ok for cover. jrb
INSP - Framing/Rough-in8/26/19998/26/19998/27/1999PPASS
DetailsJim Storey
08/26/99 301 - ceiling grid Jason ###-####
INSP - Framing/Rough-in7/22/19997/23/19997/23/1999APASS
DetailsJim Storey
07/23/99 301 - jason ###-####
INSP - Framing/Rough-in7/20/19997/20/19997/20/1999PPART
DetailsJim Storey
07/20/99 301 - back 1 hr ok for cover of walls only