BLD-Final | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Tony Young
|
|
|
###-#### ROB
sined card for final 11/9/2001 2:42:00 PM
|
BLD-Final | 11/2/2001 | 11/2/2001 | 11/2/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### ROB verbal correction--handrails need to return to wall and outside upper exit landing does not meet code--only 25 " alway from building. 11/2/2001 1:55:59 PM
|
BLD-Framing/Rough-in | 5/5/2000 | 5/5/2000 | 5/5/2000 | P | PASS |
Russ Owen
|
|
|
Rob Corrigan ###-####
|
BLD-Framing/Rough-in | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PART |
|
|
|
###-#### need fire bocking and drat stopping in place ok to hang one side of the drywall 5/4/00 5:24:02 PM
|
BLD-Foundation | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | PASS |
Wes Worcester
|
|
|
Steve Ryals ###-####
|
BLD-Foundation | 9/24/1999 | 9/27/1999 | 9/27/1999 | A | PASS |
Wes Worcester
|
|
|
Steve ###-####
|
BLD-Foundation | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | PASS |
Wes Worcester
|
|
|
STEVE- ###-#### MASONARY GROUT INSP
|
BLD-Framing/Rough-in | 9/15/1999 | 9/16/1999 | 9/22/1999 | P | PART |
Wes Worcester
|
|
|
###-####---steve---masonary grout insp per steve cancelled set up for 9/17/99
|
BLD-Foundation | 9/21/1999 | 9/22/1999 | 9/22/1999 | A | FAIL |
Wes Worcester
|
|
|
steve-- ###-#### -masonary grout insp Inadequate cover and rebar not tied in place
|
BLD-Framing/Rough-in | 9/16/1999 | 9/17/1999 | 9/17/1999 | A | FAIL |
Wes Worcester
|
|
|
NOT READY
|
INSP - Foundation | 9/8/1999 | 9/9/1999 | 9/9/1999 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 7/28/1999 | 7/28/1999 | 7/27/1999 | P | PART |
Wes Worcester
|
|
|
07/28/99 342 - footing rob ###-#### 30min call ahead to meet you (leave message, he'll check his machine)
|