BLD-Final | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PASS |
|
|
|
Jay ###-#### Signed card final Col.
|
Permanent Occupancy | | 12/6/1999 | 12/6/1999 | | DONE |
|
|
|
|
BLD-Final | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | PART |
|
|
|
LEONARD-- ###-#### FN OCC-- temp signed- need to move/ adjust exit signage 3rd's , 1st floors
|
FIRE-Final Inspection | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | PART |
Rick Jackson
|
|
|
LEONARD-- ###-#### FN FIRE occupancy approved
|
FIRE-Final Inspection | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/30/1999 at 13:31:01. Contact: ###-####. Not ready - rescheduled for pm
|
FIRE-Final Inspection | 9/30/1999 | 10/1/1999 | 10/1/1999 | P | FAIL |
Rick Jackson
|
|
|
Leanard ###-#### Sprinklers no complete; corridor doors not latching; stairwell doors not latching; exit sign at east end
|
BLD-Framing/Rough-in | 9/23/1999 | 9/23/1999 | 9/22/1999 | A | PART |
|
|
|
MADE OK TO DROP IN TILES DIFFUSERS STILL TO BE ATTACHED TO MAIN RUNNERS MUST CHECK AT FINAL INSP.
|
INSP - Wall cover | 8/26/1999 | 8/27/1999 | 8/30/1999 | A | PART |
|
|
|
08/30/99 338 - on the fire wall between the b and the a2.1
|